Laserfiche WebLink
Works Department. Equipment must also have an adequate air gap to <br />prevent cross contamination of the City's water system. <br />The use of a steel plate on the sweeper wheel to prevent tire scuffing <br />against the curb will not be permitted. <br />C. Equipment Maintenance —All required maintenance, parts, and fuel are part <br />of the Agreement and will be furnished by the Contractor. All major <br />mechanical problems must be corrected at the Contractor's yard. A <br />sufficient supply of spare brooms and other parts must be kept on hand to <br />ensure the timely and continuous fulfillment of this contract. All Contractor's <br />vehicles shall be outfitted with spill kits, in order to minimize any damage <br />caused by potential spills. At a minimum, these kits will include absorbent <br />material and towels for cleaning up spills on City streets. <br />d. Equipment Storage — Contractor must provide his own storage for <br />equipment such as sweeping machines, brooms, tires, gas, oil, and other <br />related parts and materials. The City will not provide storage for any of <br />Contractor's equipment. <br />e. Proof of Ownership — Contractor must have proof of ownership or a signed <br />lease for the duration of the Agreement for each sweeping machine used in <br />the performance of this Agreement. <br />f. Registration — Contractor's sweeping equipment must be properly <br />registered and insured in accordance with California State Motor Vehicle <br />Laws. <br />g. Safety Regulations — Contractor's sweeping equipment must conform to all <br />federal, state and local safety regulations and be properly licensed through <br />the State of California. <br />h. Signage — All sweepers operating in Redwood City shall have magnetic <br />signs attached to both the driver and passenger doors of the sweeper <br />identifying the vehicle as being a Contractor for the City. The City will <br />provide one set of signs for the primary sweeper. <br />IV. Monthly Reports <br />The Contractor will provide electronic copies of monthly street sweeping statistics to <br />the City's Public Works staff within 10 days from the beginning of each month for the <br />previous month. <br />The report shall contain: <br />• Volume of street debris collected for the month from all routes <br />• Type(s) of sweeper(s) used to complete daily routes (e.g. regenerative air <br />or mechanical broom) <br />• Number of curb miles completed each month <br />REV: 05-12-2021 MI <br />ATTY/AGR.2021/Amend. No.5/Contract Sweeping Services, LLC (Street Sweeping) (Page 7 of 36) <br />