My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2016-06-27 Closed and Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2016
>
AgdaPkt 2016-06-27 Closed and Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2016 10:47:54 AM
Creation date
6/23/2016 4:49:31 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
6/27/2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
689
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 1 O&M Inspection Report <br />Stormwater Treatment Measure Operation and Maintenance <br />Inspection Report to the City of Redwood City, California <br />This report and attached Inspection and Maintenance Checklists document the inspection <br />and maintenance conducted for the identified stormwater treatment measure(s) subject to <br />the Maintenance Agreement between the City and the property owner during the annual <br />reporting period indicated below. <br />I.Property Information: <br />Property Address or APN:275 Oracle Parkway, Redwood City, CA 94065 <br />Property Owner:Oracle America Inc. <br />II.Contact Information: <br />Name of person to contact regarding this report: Erin Allred <br />Phone number of contact person: 650-465-5048 Email:eallred@xlconstruction.com <br />Address to which correspondence regarding this report should be directed: <br />Chuck Humpal, BKF Engineers <br />255 Shoreline Drive, Suite 200 Redwood City, CA 94065 <br />III.Reporting Period: <br />This report, with the attached completed inspection checklists, documents the inspections <br />and maintenance of the identified treatment measures during the time period from <br />TBD to TBD . <br />IV.Stormwater Treatment Measure Information: <br />The following stormwater treatment measures (identified treatment measures) are located <br />on the property identified above and are subject to the Maintenance Agreement: <br />Identifying <br />Number of <br />Treatment <br />Measure <br />Type of Treatment Measure Location of Treatment Measure on the <br />Property <br />BA #1 Bioretention Planter Southwest of the parking lot <br />BA #2 Bioretention Planter Northwest of the school <br />BA #3 Bioretention Planter Northwest of the school <br />FTP #1 Flow-Through Planter Northwest of the school <br />FTP #2 Flow-Through Planter Northwest of the school <br />FTP #3 Flow-Through Planter Southwest of the school <br />ATTY/AGR/2016.160/CENTRUM OWNERS ASSOCIATION - STMMA <br />REV: 06-22-16 JS <br />6.1.K. - Page 73
The URL can be used to link to this page
Your browser does not support the video tag.