Laserfiche WebLink
Page 2 O&M Inspection Report <br />FTP #4 Flow-Through Planter North of the school <br />BA #4 Bioretention Planter Northeast of the school <br />FTP #5 Flow-Through Planter Northeast of the school <br />FTP #6 Flow-Through Planter South of the school <br />FTP #7 Flow-Through Planter East of the school <br />FTP #8 Flow-Through Planter Southeast of the school <br />BA #5 Bioretention Planter Southeast of the school <br />BA #6 Bioretention Planter North of the BCDC parking area <br />V.Summary of Inspections and Maintenance: <br />Use the attached Flow-Through Planter and Biorentention Area Inspection and <br />Maintenance Checklists to conduct inspections monthly (or as needed), identify needed <br />maintenance, and record maintenance that is conducted <br />VI. Sediment Removal: <br />Total amount of accumulated sediment removed from the stormwater treatment <br />measure(s) during the reporting period: _________ cubic yards. <br />How was sediment disposed? <br />£landfill <br />£other location on-site as described in and allowed by the maintenance <br />plan <br />£other, explain ___________________ <br />VII. Inspector Information: <br />The inspections documented in the attached Inspection and Maintenance Checklists were <br />conducted by the following inspector(s): <br />Inspector Name and Title Inspector’s Employer and Address <br />ATTY/AGR/2016.160/CENTRUM OWNERS ASSOCIATION - STMMA <br />REV: 06-22-16 JS <br />6.1.K. - Page 74