Laserfiche WebLink
Sewer Utility Finances & Rates  64  <br /> Water & Sewer Financial Plans & Rate Studies  <br />Table S9:  Cost Recovery Allocation  <br />  <br />Note: Excludes cost recovery for carryover CIP projects budgeted in prior years and Redwood City’s one‐time cash  <br />payment to SVCW in 2015/16 to help fund the City’s share of SVCW capital improvement program costs.  <br />  <br />Projected Sewer Loadings  <br />The following tables estimates the flows and loadings of each customer class based on analysis of  <br />recent winter and annual water consumption data and wastewater strength assignments for each  <br />customer class.   <br /> Residential flows per unit are based on analysis of historical winter water use data.   <br />Residential wastewater strength concentrations are based on estimates previously published  <br />by the State Water Resources Control Board (SWRCB) and are similar to wastewater strength  <br />estimates used by a number of other regional agencies.  Residential wastewater strength  <br />concentrations have increased in recent years due to transition to low‐flow toilets and  <br />water‐efficient appliances, and conservation.  Hence the wastewater strength  <br />concentrations used for residential sewage is estimated at the high end of the SWRCB’s  <br />typical residential range.  <br /> Non‐Residential Commercial and Institutional wastewater discharge is based on analysis of  <br />winter vs. annual metered water use.  Based on the analysis, roughly 80% of non‐residential  <br />flow is estimated to return to the sewer system.  Wastewater strength assignments for non‐ <br />residential customer classes are based on strength estimates previously published by the in  <br />the Revenue Program Guidelines of the SWRCB’s Policy for Implementing the State Revolving  <br />Fund for Construction of Wastewater Treatment Facilities.  <br />   <br />2016/172017/182018/193‐Year AvgFlowBODSSFlowBODSS <br />Operating  & Maintenance <br />City Operating Expenses8,136,0008,387,0008,648,0008,920,00080.0%10.0%10.0%7,136,000892,000892,000 <br />SVCW Operating Expenses9,819,00010,179,00010,552,0009,947,00026.5%33.5%40.0%2,635,9553,332,2453,978,800__________________________________________________________________________ <br />  Subtotal17,955,00018,566,00019,200,00018,867,00051.8%22.4%25.8%9,771,9554,224,2454,870,800 <br />Debt Service <br />SVCW Debt Service6,940,0007,211,00011,326,0008,492,33360.0%20.0%20.0%5,095,4001,698,4671,698,467__________________________________________________________________________ <br />  Subtotal6,940,000  7,211,000    11,326,000    8,492,33360.0%20.0%20.0%5,095,4001,698,4671,698,467 <br />Capital & Other Non‐Operating <br />City Capital Projects7,000,0007,000,0007,000,0007,000,00080.0%10.0%10.0%5,600,000700,000700,000 <br />SVCW Reserve Contributions2,653,000  3,021,000    2,770,000      2,814,66760.0%20.0%20.0%1,688,800562,933562,933__________________________________________________________________________ <br />  Subtotal9,653,000  10,021,000  9,770,000      9,814,66774.3%12.9%12.9%7,288,8001,262,9331,262,933 <br />Total 34,548,00035,798,00040,296,00037,174,00059.60%19.33%21.07%22,156,1557,185,6457,832,200 <br />Annual ExpensesAllocation %Allocation  $ <br />6.4.A. - Page 91