My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2016-06-27 Closed and Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2016
>
AgdaPkt 2016-06-27 Closed and Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2016 10:47:54 AM
Creation date
6/23/2016 4:49:31 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
6/27/2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
689
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Sewer Utility Finances & Rates 63 <br /> Water & Sewer Financial Plans & Rate Studies <br />3.10.1 Unit Rate Derivation for Cost Recovery <br />Cost Recovery Allocation <br />Table S9 shows a 3‐year projection of annual sewer expenses broken out by functional cost <br />category, and allocates the 3‐year average for each cost category for recovery from the rate <br />parameters of wastewater flow and strength, as measured by BOD (biochemical oxygen demand), <br />and SS (suspended solids). <br /> Costs for the City’s sewer collection system are allocated 80% to flow and 20% to <br />wastewater strength in recognition that most of the costs of operating and maintaining the <br />collection system are attributed to flow, but a small portion of costs are attributable to the <br />strength concentrations of wastewater discharge. <br /> SVCW operating costs are allocated based on SVCW’s adopted budget allocations. These <br />allocations recover SVCW operating costs based on each member agency’s share of total <br />SVCW influent flow and loadings. However, it is also important to note that most of SVCW’s <br />operating costs are fixed costs that do not vary with changes in wastewater flow. <br /> SVCW debt service, reserve and capital cost contributions are allocated 60% to flow, and <br />20% each to the wastewater strength parameters of BOD and SS. These allocations are <br />based on the estimated share of SVCW’s roughly $790 million capital improvement program <br />attributable to wastewater flow and strength assuming costs for SVCW’s conveyance system <br />are primarily related to flow, costs for nutrient removal are primarily related to wastewater <br />strength, and costs for other wastewater treatment plant improvements are attributable 1/3 <br />to flow, 1/3 to BOD, and 1/3 to SS. <br /> As shown at the bottom of the table, total costs are allocated for rate recovery as follows: <br />Flow: 59.60%, BOD 19.33%, and SS 21.07%. <br /> <br />6.4.A. - Page 90
The URL can be used to link to this page
Your browser does not support the video tag.