My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Ord 2424
RedwoodCity
>
City Clerk
>
Ordinances
>
2010-2019
>
2016
>
Ord 2424
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2016 12:46:40 PM
Creation date
6/30/2016 12:46:38 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Ordinance
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
6/27/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
06/27/2016 <br /> appropriate recognition to the artists in publicity and promotion regarding art in public <br /> places. <br /> D. Plaque. For each permanent installation of art in public places, an appropriate <br /> identification plaque or monument measuring at least eight inches by eight inches shall <br /> be installed. The plaque shall be made of cast metal and be placed near the art piece. <br /> Information is limited to the date, title and artist. The requirement of this Section 45.070(D) <br /> may be waived by the City Council if determined in a particular circumstance to be <br /> unnecessary or inconsistent with the intent of this chapter. <br /> Sec. 45.080 Contribution from Capital Outlay Fund. <br /> A. It shall be City policy to set aside one (1) percent of its annual Capital Outlay <br /> Fund as defined in Section 2.41.1 of this Code, or such other percentage as determined <br /> annually by the City Council, for the purpose of providing for art in public places. Such <br /> percentage shall be placed in the Art in Public Places Fund. Except as provided in this <br /> Section, all capital projects shall be subject to this policy, including but not limited to <br /> buildings, shelters, parking garages and lots, restrooms, small structures, parks, medians, <br /> landscaping, plazas, gateways, bridges, walls, tunnels, waterways, and street and road <br /> construction. Salaries and benefits of public employees supporting capital projects shall <br /> not be included in the capital outlay fund budget subject to this ordinance. <br /> The following capital projects are excluded from this policy: <br /> 1. ADA compliance projects (not including projects where ADA compliance <br /> is a portion of a larger project). <br /> 2. Road, path and sidewalk repairs, including: traffic signals and upgrades, <br /> curb and gutter repairs, sign reflectivity, road and parking signage, <br /> resurfacing of roads or other existing hardscape areas. <br /> 3. Emergency repair projects. <br /> 4. Cyclical replacement and repair of trails, outdoor furnishings, or fencing. <br /> 5. Studies. <br /> 6. Roof replacement. <br /> 7. Mechanical, security, AN equipment, HVAC, and IT installations, <br /> upgrades and repairs. <br /> 8. Art in public places fund. <br /> 9. Utilities projects, except where the project includes construction or <br /> reconstruction of a building. <br /> 10. Vehicle repair and replacement. <br /> 11. Seismic upgrades and waterproofing. <br /> 12. Projects where the majority of the cost is allocated to elements located <br /> underground. <br /> Page 7 of 13 <br /> ATTY/ORD.429/PUBLIC ART FUND AND PROVISION OF PUBLIC ART BY PRIVATE DEVELOPERS ORD.N0.2424 <br /> REV:06-17-1615 MUFF NO.301 <br />
The URL can be used to link to this page
Your browser does not support the video tag.