My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2016-07-25 Closed and Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2016
>
AgdaPkt 2016-07-25 Closed and Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2016 5:31:02 PM
Creation date
7/21/2016 5:14:23 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
7/25/2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
499
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ATTY/RESO.0070/CC RESO DENYING APPEALS & APPROVING PERMIT FOR 603 JEFFERSON <br />REV: 07-15-16 VR <br />Page 13 of 22 <br />b. Treatment Measure Inspection – Applicant shall coordinate installation of <br />stormwater treatment measures with the municipality, shall arrange to have <br />the City’s designated inspector present at the time of installation, and shall <br />have the City’s designated inspector complete a final inspection of installed <br />stormwater treatment measure immediately after installation is complete. <br />Tree Wells - High flow-rate tree well filter products and/or high flow-rate <br />media filter products shall be certified by the Technical Assessment <br />Protocol Ecology (TAPE) of the Washington State Department of Ecology <br />as meeting the TAPE protocol General Use Level Designation for Basic <br />Treatment. For TAPE program information and use level designation <br />statements. <br />40. Stormwater Management Plan (SWMP) – Applicant shall prepare a SWMP that <br />includes, at a minimum, exhibit(s) showing drainage areas and location of Low <br />Impact Development (LID) treatment measures; total project site area and total <br />area of land disturbed; total new and/or replaced impervious area; treatment <br />measures and hydraulic sizing calculations; a listing of source control and site <br />design measures to be implemented at the site; saturated hydraulic conductivity <br />rate(s) at relevant locations or hydrologic soil type (A, B, C or D) and source of <br />information; elevation of high seasonal groundwater table; and a brief summary of <br />how the project is complying with Provision C.3 of the MRP. <br />[SDR][ENGINEERING] <br />41. Stormwater BMPs - Stormwater Pollution Prevention Program Best Management <br />Practices (BMPs) for construction shall be implemented to protect water quality, in <br />accordance with the approved Stormwater Pollution Prevention Plan (SWPPP). <br />BMP plan sheets are available electronically for inserting into project plans. <br />[SDR][ENGINEERING] <br />Street Infrastructure Improvements <br /> <br />42. Off-Site Streetscape Improvements – All off-site streetscape improvements shall <br />adhere to City Engineering Standards, and are subject to review and change by <br />the City Landscape Architect. [COA][PLANNING][ENGINEERING] <br />43. Streetlights - A new streetlight shall be installed, if needed, as determined by the <br />City Engineer. Streetlights are required on the construction of a new commercial <br />building or performance of substantial commercial remodeling with street frontage <br />of 200 feet or more. The style and location of all streetlights shall be as determined <br />by the City Landscape Architect. [SDR][ENGINEERING] <br />44. Installation of Bulb-Outs – The project shall install concrete bulb-outs and <br />continental-style high visibility crosswalks at each of the four corners of the <br />Jefferson/Bradford intersection. The bulb-outs shall be uniform in size, and provide <br />for directional curb ramps across each street. The project shall revise existing <br />storm drain infrastructure and/or add new storm drain infrastructure as needed to <br />allow for the installation of the bulb-outs. The slopes of sidewalks, streets, and <br />gutters shall meet with City Standard Design Criteria. [COA] [ENGINEERING] <br />8.C. - Page 43
The URL can be used to link to this page
Your browser does not support the video tag.