My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2016-07-25 Closed and Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2016
>
AgdaPkt 2016-07-25 Closed and Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2016 5:31:02 PM
Creation date
7/21/2016 5:14:23 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
7/25/2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
499
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ATTY/RESO.0070/CC RESO DENYING APPEALS & APPROVING PERMIT FOR 603 JEFFERSON <br />REV: 07-15-16 VR <br />Page 12 of 22 <br />34. Recycled Water Facilities – Recycled water (purple pipe) facilities shall be <br />provided and designed in accordance with Engineering Standards for dual <br />plumbing, irrigation, and other warranted uses per the Recycled Water Ordinance, <br />Chapter 38. Services that are to be supplied by recycled water (either at the time <br />of project completion or at a future date) shall be designed to properly function at <br />the design pressure required by Engineering. Upon a final determination by the <br />City that recycled water is available for the property, the applicant shall connect <br />the project to the recycled water system. The project shall provide one “master” <br />recycled water meter for residential dual plumbing and a separate recycled water <br />meter for the commercial/retail space dual plumbing. [SDR][ENGINEERING] <br />35. Dual Plumbing Report - The applicant shall hire an engineer licensed in California <br />and experienced in the field of wastewater treatment to prepare a report pursuant <br />to California Water Code section 13522.5 and in accordance with California Code <br />of Regulations sections 60314 and 60323 (found within Title 22, Division 4, <br />Chapter 3). The report shall be submitted with the first building submittal, and will <br />be routed to the Public Works Department for review and coordination. <br />[COA][ENGINEERING] <br />36. Discharge Permit for Subterranean Garages - If the subterranean garage <br />requires groundwater pumping into the sewer system, a Discharge fee will apply <br />and a Discharge Permit will be required by Silicon Valley Clean Water (SCVW) <br />prior to issuance of the building permit. If the subterranean garage requires <br />groundwater pumping into the storm drain system, a permit is required from the <br />Regional Water Quality Control Board (RWQCB) in addition to any provisions <br />requested by the City. [SDR][ENGINEERING] <br />37. Backflow Protection – Backflow protection on all water services is required. The <br />backflow preventer shall be above grade and located on private property, <br />accessible to the Public Works division for testing. [COA][ENGINEERING] <br />38. Fire Flow - The Project shall meet fire flow requirements as established by the <br />Fire Department which are based on the Fire Code. Fire flow tests are typically <br />performed during the preliminary design phase but must be completed prior to <br />submittal of final design. Applicant shall contact the Fire Department for fire flow <br />requirements, and then submit a written fire flow test request to Engineering. <br />[COA][ENGINEERING] <br />39. C3 Requirements - Plans shall be designed to meet C3 requirements of the <br />Municipal Regional Permit (MRP) NPDES Permit CAS612008 and be in <br />compliance with San Mateo County C.3 Stormwater Technical Guidance. <br />[SDR][ENGINEERING] <br />a. Treatment Controls – Treatment measures to be shown on final <br />improvement or grading plans shall not differ materially from the treatment <br />measures presented on the project’s Tentative Map, approved on May 17, <br />2016, without written approval from the Engineering Department. <br />8.C. - Page 42
The URL can be used to link to this page
Your browser does not support the video tag.