My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2016-07-25 Closed and Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2016
>
AgdaPkt 2016-07-25 Closed and Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2016 5:31:02 PM
Creation date
7/21/2016 5:14:23 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
7/25/2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
499
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ATTY/RESO.0070/CC RESO DENYING APPEALS & APPROVING PERMIT FOR 603 JEFFERSON <br />REV: 07-15-16 VR <br />Page 11 of 22 <br />project. The study shall consider existing, project, other approved projects, and <br />applications currently under review in determining the needed capacity. If the <br />existing sewer main is less than 6” in size, or is in any other way not sufficient as <br />determined by the City Engineer, applicant shall, as part of the Project, construct <br />and install new sewer mains sufficient to meet such requirements, in accordance <br />with the City's Engineering standards and as directed by the City Engineer to the <br />City Engineer's satisfaction. [SDR][ENGINEERING] <br />28. Peak Wet Weather Flow Capacity – Redwood City has exceeded its Peak Wet <br />Weather Flow (PWWF) capacity in the past. A methodology to reduce inflow and <br />infiltration (I/I) by pipe replacement was determined. The applicant shall reduce <br />(I/I) to offset increased sewer demand from the project by replacing aged sewer <br />mains or pay an equivalent in-lieu fee. The length of pipe replacement required or <br />the amount of fee will be based on the project’s sewage generation projection <br />(Attachment L of the City’s Engineering Standards). For parcels within Redwood <br />City but connecting to County owned and maintained sewer, an I/I in-lieu fee may <br />be collected by Redwood City if the County does not require main replacement or <br />collect and in-lieu fee. [COA][ENGINEERING] <br />29. Sewer Lateral Limit – The project is limited to one sewer lateral per parcel. <br />[COA][ENGINEERING] <br />30. Sewer connection – No new lateral connections shall be made to sewer trunk <br />mains. All sewer laterals shall connect to collector mains. [COA] [ENGINEERING] <br /> <br />31. Sewer Lateral Size for Commercial Development - For new or remodeled <br />commercial buildings, sewer laterals less than 4” shall be upgraded to a minimum <br />6” size. [SDR] [ENGINEERING] <br /> <br />32. Water Mains - Prior to encroachment permit issuance, submit to City, and obtain <br />approval of, an evaluation and report, prepared by a licensed engineer, in <br />conformance with the City's Engineering Standards, demonstrating that the <br />proposed water main meets the domestic and fire flow requirements in accordance <br />with City Code Section 38.26 and the International Fire Code. If the existing water <br />main is less than 6” in size, or is in any other way not sufficient as determined by <br />the City Engineer, applicant shall, as part of the Project, construct and install new <br />water mains sufficient to meet such requirements, in accordance with the City's <br />Engineering Standards and as directed by the City Engineer. New water mains <br />shall be 8” minimum in size and extend across the entire property frontage, from <br />the nearest point of connection to an existing 6” or larger water <br />main.[SDR][ENGINEERING] <br />33. Water Meters – The project shall provide one “master” water meter for domestic <br />water service, and a separate domestic water meter for the commercial/retail <br />space. Any metering for individual units must be accomplished by private sub- <br />meters within the property. [COA][ENGINEERING] <br />8.C. - Page 41
The URL can be used to link to this page
Your browser does not support the video tag.