My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2016-07-25 Closed and Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2016
>
AgdaPkt 2016-07-25 Closed and Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2016 5:31:02 PM
Creation date
7/21/2016 5:14:23 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
7/25/2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
499
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ATTY/RESO.0070/CC RESO DENYING APPEALS & APPROVING PERMIT FOR 603 JEFFERSON <br />REV: 07-15-16 VR <br />Page 10 of 22 <br />set at or above the base flood elevation, with a recommendation of setting the <br />lowest finished floor elevation 1 foot above the base flood elevation. Chapter 41 <br />of the City’s municipal code requires that all building permits and project <br />plans meet the requirements of the FIRM in effect at the time of permit <br />issuance, regardless of when the project was submitted or deemed <br />complete. Although the project will not be required to consider the updated base <br />flood elevations if construction has started prior to the effective date of the FIRM <br />revisions, the owner may still be subject to FEMA flood insurance requirements <br />based on the elevation certificate filed upon completion of the project. It is <br />recommended that the FFE and any floodproofing be designed to accommodate <br />the new base flood elevations, and that the applicant considers implications to <br />future flood insurance requirements. [COA] [ENGINEERING] <br />24. Elevation Certificate – If all or a portion of the site is within a Special Flood Hazard <br />Area (as shown on the latest FEMA Flood Insurance Rate Maps in effect at building <br />permit issuance), upon completion of the structure, the elevation of the lowest floor <br />(including basement when applicable) shall be certified by a registered <br />professional engineer or land surveyor, verified by the City’s Building Inspector to <br />be properly elevated, and provided to the Floodplain Administrator. Where required <br />by Chapter 41 of the City’s Municipal Code, the applicant shall also submit <br />certification by a registered professional engineer or architect that the standards <br />for elevation and floodproofing have been satisfied. [COA][ENGINEERING] <br />Utility Infrastructure Improvements <br />25. Conformance with the City’s Engineering Standards – All public improvements <br />shall be designed and constructed in accordance with the City’s Engineering <br />Standards. [SDR][ENGINEERING] <br />26. Encroachment Permits – Obtain an Encroachment Permit from the Community <br />Development Department for work listed below. This permit shall be obtained prior <br />to the commencement of construction of the road, utilities, or any site <br />improvements. [SDR][ENGINEERING] <br />a. Work in the City public right-of-way, easements or property in which the City <br />holds an interest. <br />b. Work requiring a grading permit. Grading permits require a Plot and <br />Finished Grading Plan prepared by a California-registered Civil Engineer. <br />c. Work requiring on-site shoring which affects the public right-of-way. <br />d. Work using the public right-of-way for any fixed structure (awnings, roof <br />overhangs, fixed planters, etc.). Insurance, meeting the City’s standards, is <br />required. This permit will be recorded against the property. <br />27. Sewer Capacity – Prior to encroachment permit issuance, submit to the City, and <br />obtain approval of, an evaluation and report prepared by a licensed engineer <br />demonstrating that the existing sewer mains have sufficient capacity for the <br />8.C. - Page 40
The URL can be used to link to this page
Your browser does not support the video tag.