Laserfiche WebLink
from RWQCB, and Streambed Alteration Agreement from CDFW. <br />This project does not require a National Pollutant Discharge Elimination System <br />(NPDES) General Permit for stormwater discharges associated with construction and <br />land disturbance activities pursuant to Attachment A.2 of Order No. R2-2015-0049, <br />NPDES Permit No. CAS612008, which exempts projects to update existing lines and <br />facilities. However, the proposed construction will employ stormwater pollution <br />prevention best methods and practices. <br /> <br /> <br />SERENA ZHU <br />ASSISTANT ENGINEER I <br /> <br /> <br />AARON AKNIN <br />COMMUNITY DEVELOPMENT DIRECTOR <br /> <br />MELISSA STEVENSON DIAZ <br />CITY MANAGER <br /> <br />ATTACHMENTS <br />Project Location Map <br /> <br />RELATED DOCUMENTS IN CITY CLERK’S OFFICE <br />1. Drawings and Contract Documents <br />2. Bid Documents <br /> <br /> <br />6.1.B. - Page 3