ATTY/RESO.0070/CC RESO DENYING APPEALS & APPROVING PERMIT FOR 603 JEFFERSON <br />REV: 07-15-16 VR <br />Page 18 of 22 <br />70. Public Parking During Construction – Temporary parking meter permits shall <br />be issued prior to removing any public parking spaces from public use during <br />construction. An application fee of $30.00, together with the parking meter fees <br />applicable for the expected duration of the temporary parking meter permit ($2.00- <br />$8.00 daily per space depending on location) shall be paid in advance prior to <br />issuance of the permit. [SDR][ENGINEERING] <br />71. Winterizing - If construction is not complete by the start of the wet season <br />(October 1 through April 30), implement a winterization program to minimize the <br />potential for erosion and sedimentation. As appropriate to the site and status of <br />construction, winterization requirements shall include <br />inspecting/maintaining/cleaning all soil erosion and sedimentation controls prior to, <br />during, and immediately after each storm event; stabilizing disturbed soils through <br />temporary or permanent seeding, mulching, matting, tarping or other physical <br />means; rocking unpaved vehicle access to limit dispersion of much onto public <br />right-of-way; and covering/tarping stored construction materials, fuels, and other <br />chemicals. Plans to include proposed measures to prevent erosion and polluted <br />runoff from all site conditions shall be submitted for approval by CDD prior to <br />beginning construction. As site conditions warrant, the City Engineer may direct <br />the applicant to implement additional winterization requirements. <br />[COA][ENGINEERING] <br />72. Grading – Grading shall be performed in accordance with the City’s Engineering <br />Standards. Soil or other construction materials shall not be stockpiled in the public <br />right-of-way. Submit cut/fill volumes (CY) for all soils to be imported to or exported <br />from the site. [SDR][ENGINEERING] <br />73. Monitoring - The Soils Engineer shall conduct continuous site inspections during <br />trenching and backfill operations at the applicant’s expense. The Soils Engineer <br />shall take compaction tests and submit the results to Engineering & Construction. <br />[SDR][ENGINEERING] <br />74. Contaminated Soil and Groundwater – Removal and disposal of contaminated <br />soil and groundwater for project excavation shall require pre-notification of the San <br />Mateo County Health System Groundwater Protection Program (GPP), and the <br />implementation of GPP-defined handling and disposal protocols. These protocols <br />shall be described in a soil and groundwater management plan prior to <br />construction, and subject to review and approval by the City and the County GPP. <br />The plan shall address all items detailed in the Summary of Section VIII of the <br />project Initial Study. [COA][PLANNING] <br />Downtown Specific Projects <br />75. Downtown Mitigation Measures – Implement and comply with all applicable <br />mitigation measures described in the Environmental Impact Report (EIR) and <br />Mitigation Monitoring Program (MMRP) for the Downtown Precise Plan, adopted <br />by the City Council by Resolution No. 15086, including mitigations expressly <br />identified in the Initial Study for this project. [SDR][PLANNING] <br />8.C. - Page 48