My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt16 Sandis, Civil Engineers, Surveyors, Planners
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2016
>
Under 60K
>
Agmt16 Sandis, Civil Engineers, Surveyors, Planners
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2016 12:38:32 PM
Creation date
7/28/2016 12:37:02 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Sandis, Civil Engineers, Surveyors. Planners
PROJECT NAME
Topographic Base Maps - for Alameda de las Plgas Sidewalk Improvement Project
Date
7/27/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Agreement nor any of its provisions may be amended, modified , waived or discharged <br /> except in a writing signed by both parties. <br /> 27. Authority. The individuals executing this Agreement and the instruments <br /> referenced in it on behalf of Consultant each represent and warrant that they have the <br /> legal power, right and actual authority to bind Consultant to the terms and conditions of <br /> this Agreement. <br /> CITY: City of Redwood City, <br /> 1017 Middlefield Road <br /> Redwood City, CA 94063 <br /> • By: 1.;1774\--C '1a7 L� <br /> Melissa S. Diaz, City Manager <br /> ATTEST <br /> I <br /> ¶via VJff - rlinden, City Clerk <br /> CONSULTANT: SANDIS <br /> 1700 S . Winchester Blvd . , Suite 200 <br /> Campbell, CA 95008 <br /> (408) 636-0900 telephone <br /> (408) 636-0999 facsimile <br /> *By: ' �- 1 **By: b <br /> ° rinted Name: .2£ �.-{ o/ f Print: • Name: S } <br /> Title: 5 4[c�c. Title: U( C�; 1S f01'l/ <br /> � t <br /> If required by City, proper notarial acknowledgment of execution by Consultant must be attached. If a Corporation, <br /> Agreement must be signed by one corporate officer from each of the following two groups. <br /> *Group A. '"Group B. <br /> Chairman, Secretary, <br /> President, or Assistant Secretary, <br /> Vice-President CFO or Assistant Treasurer <br /> Otherwise, the corporation must attach a resolution certified by the secretary or assistant secretary under corporate <br /> seal empowering the officer(s) signing to bind the corporation. <br /> REV: 07-05-16 VR <br /> Page 8 of 12 <br /> ATTY/AGR.2016.174/SANDIS, Civil Engineers, Surveyors, Planners - Alameda Project <br />
The URL can be used to link to this page
Your browser does not support the video tag.