Laserfiche WebLink
, <br /> d. <br /> Breakdown of Fee Schedule: <br /> Field Services <br /> Engineering Tech. Trench Backfill 16 days @ 4 hrs/day = 64 hrs @ $89.00 hr = $5,696.00 <br /> Engineering Tech. Roadway Subgrade 7 days @ 4 hrs/day = 28 hrs @ $89.00 hr = $2,492.00 <br /> Engineering Tech. Roadway Aggregate <br /> Base 7 days @ 4 hrs/day = 28 hrs @ $89.00 hr = $2,492.00 <br /> Engineering Tech. HMA Paving 10 days @ 8 hrs/day = 80 hrs @ $89.00 hr = $7,120.00 <br /> Engineering Tech. Concrete 4 days @ 4 hrs/day = 16 hrs @ $89,00 hr = $1,424.00 <br /> Subtotal $19,224.00 <br /> Laboratory Testing- Soil/AB/Asphalt <br /> Concrete <br /> Oil Content (CTM 382) 5 tests @ $64.00 ea = $320.00 <br /> Sieve Analysis (CTM 202) 10 tests @ $78,00 ea = $780.00 <br /> Mix Moisture (CTM 370) 5 tests @ $53.00 ea _ $265,00 <br /> Concrete Compression (CTM 521) 200 tests @ $40.00 ea = $8,000.00 <br /> Max Density (ASTM D1557, CTM 304) 100 tests @ $206.00 ea = $20,600.00 <br /> Stability Value (CTM 366) 10 tests @ $206.00 ea = $2,060.00 <br /> R-Value (CTM 301) 10 tests @ $215.00 ea = $2450.00 <br /> Subtotal $34,175.00 <br /> Review and Reports (Staff 100 hrs. @ = $0.00 <br /> Professional) <br /> $53,399.00 <br /> Total inspection and Material Testing Cost $53,399.00 <br /> The Consultant shall invoice monthly based on actual time spent in the field and the <br /> material testing done inthe laboratory. <br /> Page 12 of 12 <br /> REV: 0&-20-16 RL <br />