My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2016-08-08 Closed and Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2016
>
AgdaPkt 2016-08-08 Closed and Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2016 4:51:41 PM
Creation date
8/4/2016 4:46:14 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
8/8/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
169
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
- 2 - <br />evaluation of the proposed monument site, if any. The City Manager, or <br />his or her designee, shall decide whether to forward the proposal for <br />further review or to decline further City consideration of the proposed <br />monument based upon considerations consistent with this policy. If the <br />City Manager’s decision is to conduct further review of the proposal, the <br />City Manager or his or her designee shall refer the proposal to the <br />appropriate department for review as detailed in 3.3. <br />3.3. If further review is warranted, the department shall prepare a report for <br />City Manager consideration, in conjunction with other departments such <br />as the Parks, Recreation, and Community Services and Public Works <br />departments. Following review of the report, if the City Manager or his or <br />her designee intends to present the proposed monument to the City <br />Council, the department shall consult with the City commission most <br />closely associated with the proposed site of the Monument, if any. The <br />commission shall review the proposed monument and submit an advisory <br />recommendation to the City Council regarding its recommendation based <br />upon the factors set forth in this policy and the review criteria as detailed <br />below in Section 5. If commission review is unnecessary, then the City <br />Manager shall submit the recommendation directly to City Council. If the <br />City Manager decides to forward the proposal for Council review, the Clerk <br />shall notify the proposer of the date for Council consideration and/or for <br />the subsequent action by City Council. <br />3.4. The City Council shall have final approval of a City project to design and <br />construct a monument, or to accept a donated monument. The City <br />Council shall consider the commission’s recommendation, if applicable, <br />and the City Manager’s report in evaluating whether to approve the <br />monument. <br />3.5. All required environmental review shall be approved by the City’s planning <br />department before the City commits to installing a monument. The <br />monument shall be consistent with adopted City master plans. <br />3.6. Final approval shall be made by the City Council after any necessary <br />approvals from Boards and/or Commissions have first been obtained. <br />3.7. The City shall only proceed with the design, fabrication, and installation of <br />a Monument after completion of the review process and City Council <br />approval of the monument. <br />3.8. The final location of the monument shall be determined by the City <br />Manager with approval by the City Council. <br />3.9. After the City’s acceptance of a monument and subject to City’s explicit <br />approval of installation of the monument upon City property, title to the <br />8.B. - Page 9
The URL can be used to link to this page
Your browser does not support the video tag.