My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso PC16-12 0074 PC Reso Stanford Parking Garage
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2016
>
Reso PC16-12 0074 PC Reso Stanford Parking Garage
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:58:26 AM
Creation date
8/23/2016 5:07:28 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
Planning Commission
Date
8/16/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
a. Water all exposed surfaces (e.g., parking areas, staging areas, soil piles, <br /> graded areas, and unpaved access roads) two times per day. <br /> b. Cover all haul trucks transporting soil, sand, or other loose material off-site. <br /> c. Remove all visible mud or dirt track-out onto adjacent public roads using wet <br /> power vacuum street sweepers at least once per day. Dry power sweeping <br /> is prohibited. <br /> d. Limit speeds of all vehicle on unpaved roads to 15 mph. <br /> e. Pave all roadways, driveways, and sidewalks as soon as possible. Building <br /> pads shall be laid as soon as possible after grading unless seeding or soil <br /> binders are used. <br /> f. Minimize idling times either by shutting equipment off when not in use or <br /> reducing the maximum idling time to 5 minutes(as required by the California <br /> airborne toxics control measure Title 13, Section 2485 of California Code of <br /> Regulations [CCR]). Provide clear signage for construction workers at all <br /> access points. <br /> g. Maintain and properly tune all construction equipment in accordance with <br /> manufacturer's specifications. All equipment shall be checked by a certified <br /> visible emissions evaluator. <br /> h. Post a publicly visible sign with the telephone number and person to contact <br /> at the lead agency regarding dust complaints. This person shall respond and <br /> take corrective action within 48 hours. The Air District's phone number shall <br /> also be visible to ensure compliance with applicable regulations. <br /> 58. Stormwater Pollution Prevention Program Best Management Practices (BMPs) — <br /> BMPs for construction shall be implemented to protect water quality, in accordance with <br /> the approved Stormwater Pollution Prevention Plan (SWPPP). BMP plan sheets are <br /> available electronically for inserting into project plans. [SDR][ENGINEERING] <br /> 59. Permanent Stormwater Treatment Measures — Applicant shall coordinate installation <br /> of permanent stormwater treatment measures with the municipality and shall arrange to <br /> have the City's inspector present at the time of installation. Applicant shall be responsible <br /> for all fees associated with special stormwater inspections during construction. <br /> [SDR][ENGINEERING] <br /> 60. Stormwater Treatment Measures — Stormwater treatment measures to be shown on <br /> final improvement or grading plans shall not differ materially from the LID treatment <br /> measures presented on the project's Tentative Parcel Map, approved on August 16, <br /> 2016, without written approval from the Engineering Department. <br /> [COA][ENGINEERING]. <br /> ATTY/RESO.0074/PC RESO STANFORD PARKING GARAGE <br /> REV:08-11-16 JS Page 14 of 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.