My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso PC16-12 0074 PC Reso Stanford Parking Garage
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2016
>
Reso PC16-12 0074 PC Reso Stanford Parking Garage
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:58:26 AM
Creation date
8/23/2016 5:07:28 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
Planning Commission
Date
8/16/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
61. No Dumping Flows to the Bay— On-site storm drain inlets shall be clearly marked with <br /> the words "No Dumping! Flows to Bay," or equivalent using thermoplastic material or a <br /> plaque. [SDR][ENGINEERING] <br /> 62. NOI — The applicant shall file a Notice of Intent (NOI) with the State Water Resources <br /> Control Board under the Construction Activities Storm Water General Permit (General <br /> Permit). The NOI indicates the applicant's intent to comply with the San Mateo <br /> Countywide Stormwater Pollution Prevention Program, including a Stormwater Pollution <br /> Prevention Plan (SWPPP). [SDR][ENGINEERING] <br /> 63. Building Materials Specifications — Buried metal infrastructure shall have cathodic <br /> protecting using a sacrificial anode system that conforms to Part VII (G) of the City's <br /> water system design criteria and standard specification details Section 02661. <br /> Additionally, concrete mixes shall conform to Caltrans specifications for Protection of <br /> Reinforcement Against Corrosion Due to Chlorides, Acids, and Sulfates as outlined in <br /> the Memo to Designers 10-5, January 2002.[SDR][BUILDING] <br /> 64. Winterizing — If construction is not complete by the start of the wet season (October 1 <br /> through April 30), the applicant shall implement a winterization program to minimize the <br /> potential for erosion and sedimentation. As appropriate to the site and status of <br /> construction, winterization requirements shall include inspecting/maintaining/cleaning all <br /> soil erosion and sedimentation controls prior to, during, and immediately after each storm <br /> event; stabilizing disturbed soils through temporary or permanent seeding, mulching, <br /> matting, tarping or other physical means; rocking unpaved vehicle access to limit <br /> dispersion of much onto public right-of-way; and covering/tarping stored construction <br /> materials, fuels, and other chemicals. Plans to include proposed measures to prevent <br /> erosion and polluted runoff from all site conditions shall be submitted for approval by <br /> CDD prior to beginning construction. As site conditions warrant, the City Engineer may <br /> direct the applicant to implement additional winterization requirements. <br /> [COA][ENGINEERING] <br /> 65. Materials Mock-Up — Prior to final foundation inspection, prepare a mock-up that is <br /> outdoors, readily accessible, and will remain intact until the project has reached <br /> substantial completion. The mock-up should include all project colors and materials, <br /> windows for the base and top, balconies, lighting, and architectural details, as well as <br /> construction details, such as the weep screen, to understand how the design addresses <br /> them. Then schedule a mock-up meeting with the Planning and Building Departments <br /> for final review and approval of the project details. Submit an updated colors and <br /> materials board or details if any changes are made as a result of the mock-up meeting. <br /> 66. Certification Letters - Prior to final inspection, submit certification letters from the <br /> following architects verifying that the project, as constructed, complies with approved <br /> plans. After the certification letter has been submitted, the project planner will also <br /> confirm substantial compliance with the approved plans during the scheduled final <br /> inspection. [COA][PLANNING]: <br /> a. Project Landscape Architect verifying substantial conformance with the <br /> approved landscape plan, including species, size, quantity, and location of <br /> ATTYIRESO.0074/PC RESO STANFORD PARKING GARAGE <br /> REV:08-11-16 JS Page 15 of 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.