Street closures require submission of traffic control plans and approval in advance. <br /> [SDR][ENGINEERING] <br /> 69. Lane Closures —Traffic control for lane closures shall conform to the Work Area Traffic <br /> Control Handbook; street closures require prior submission of traffic control plans to be <br /> approved in advance. [COA][ENGINEERING] <br /> 70. Grading— Grading shall be performed in accordance with Volume Ill, Part II of the City's <br /> Engineering Standards. Soil or other construction materials shall not be stockpiled in the <br /> public right-of-way. The applicant shall submit cut/fill volumes (CY) for all soils to be <br /> imported to or exported from the site. [SDR][ENGINEERING] <br /> 71. Monitoring — The Soils Engineer shall conduct continuous site inspections during <br /> trenching and backfill operations at the applicant's expense. The Soils Engineer shall <br /> take compaction tests and submit the results to Engineering & Construction. <br /> [SDR][ENGINEERING] <br /> 72. Construction Coordination — The construction activities shall not impact adjoining <br /> properties, including ingress egress operations, without providing adequate planning for <br /> fire protection and life safety. All planning efforts shall be agreed to by the adjoining <br /> property owners and approved by the fire and building departments. <br /> [SDR}[ENGINEERING] <br /> 73. Construction Noise—The applicant shall comply with the following construction-period <br /> noise abatement measures: [SDR][BUILDING] <br /> a. Construction Plan. Prepare a detailed construction plan identifying the <br /> schedule for major noise-generating construction activities. The construction <br /> plan shall identify a procedure for coordination with nearby noise-sensitive <br /> facilities so that construction activities and the event schedule can be <br /> scheduled to minimize noise disturbance. This plan shall be provided to all <br /> noise-sensitive land uses within 500 feet of the construction site. <br /> b. Construction Equipment Mufflers and Maintenance. Equip all internal <br /> combustion engine-driven equipment with intake and exhaust mufflers that <br /> are in good condition and appropriate for the equipment. <br /> c. Equipment Locations. Locate stationary noise-generating equipment <br /> required on construction project sites as far as possible from sensitive <br /> receptors when sensitive receptors adjoin or are near a construction project <br /> site. <br /> d. Quiet Equipment Selection. Use quiet construction equipment, particularly <br /> air compressors, wherever feasible. <br /> e. Temporary Barriers. Construct solid plywood fences around construction <br /> sites adjacent to residences, operational businesses, or noise-sensitive land <br /> uses. <br /> ATTY/RESO.0075/PC RESO 1629 MAIN STREET(BUTLER) <br /> REV:08-16-16 VR Page 15 of 22 <br />