f. Temporary Noise Blankets. Temporary noise control blanket barriers should <br /> be erected along building facades of construction sites to attenuate noise <br /> from elevated activities if noise conflicts cannot be resolved by scheduling. <br /> (Noise control blanket barriers can be rented and quickly erected.) <br /> g. Noise Disturbance Coordinator. For projects that would last over one year <br /> in duration, the City may choose to require project designation of a "Noise <br /> Disturbance Coordinator" who would be responsible for responding to any <br /> local complaints about construction noise. The Disturbance Coordinator <br /> would determine the cause of the noise complaint (e.g., starting too early, <br /> bad muffler, etc.) and institute reasonable measures to correct the problem. <br /> Post in a conspicuous location a telephone number for the Disturbance <br /> Coordinator at the construction site and include it in the notice sent to <br /> neighbors regarding the construction schedule. (The project sponsor should <br /> be responsible for designating a Noise Disturbance Coordinator, posting the <br /> phone number, and providing construction schedule notices. The Noise <br /> Disturbance Coordinator would work directly with an assigned City staff <br /> member.) <br /> 74. Construction Air Emissions —The applicant shall comply with the following measures <br /> to reduce air emissions during construction:[SDR][BUILDING] <br /> a. Water all exposed surfaces (e.g., parking areas, staging areas, soil piles, <br /> graded areas, and unpaved access roads) two times per day. <br /> b. Cover all haul trucks transporting soil, sand, or other loose material off-site. <br /> c. Remove all visible mud or dirt track-out onto adjacent public roads using wet <br /> power vacuum street sweepers at least once per day. Dry power sweeping <br /> is prohibited. <br /> d. Limit speeds of all vehicle on unpaved roads to 15 mph. <br /> e. Pave all roadways, driveways, and sidewalks as soon as possible. Building <br /> pads shall be laid as soon as possible after grading unless seeding or soil <br /> binders are used. <br /> f. Minimize idling times either by shutting equipment off when not in use or <br /> reducing the maximum idling time to 5 minutes (as required by the California <br /> airborne toxics control measure Title 13, Section 2485 of California Code of <br /> Regulations [CCR]). Provide clear signage for construction workers at all <br /> access points. <br /> g. Maintain and properly tune all construction equipment in accordance with <br /> manufacturer's specifications. All equipment shall be checked by a certified <br /> visible emissions evaluator. <br /> ATTY/RESO.0075/PC RESO 1629 MAIN STREET(BUTLER) <br /> REV:08-16-16 VR Page 16 of 22 <br />