Laserfiche WebLink
ATTY/RESO.0043/PC RESO 603 JEFFERSON <br />REV: 05-18-16 VR <br />Page 10 of 19 <br />37. Backflow Protection – Backflow protection on all water services is required. The <br />backflow preventer shall be above grade and located on private property, accessible <br />to the Public Works division for testing. [COA][ENGINEERING] <br />38. Fire Flow - The Project shall meet fire flow requirements as established by the Fire <br />Department which are based on the Fire Code. Fire flow tests are typically performed <br />during the preliminary design phase but must be completed prior to submittal of final <br />design. Applicant shall contact the Fire Department for fire flow requirements, and <br />then submit a written fire flow test request to Engineering. [COA][ENGINEERING] <br />39. C3 Requirements - Plans shall be designed to meet C3 requirements of the Municipal <br />Regional Permit (MRP) NPDES Permit CAS612008 and be in compliance with San <br />Mateo County C.3 Stormwater Technical Guidance. [SDR][ENGINEERING] <br />a. Treatment Controls – Treatment measures to be shown on final improvement <br />or grading plans shall not differ materially from the treatment measures <br />presented on the project’s Tentative Map, approved on May 17, 2016, without <br />written approval from the Engineering Department. <br />b. Treatment Measure Inspection – Applicant shall coordinate installation of <br />stormwater treatment measures with the municipality, shall arrange to have the <br />City’s designated inspector present at the time of installation, and shall have <br />the City’s designated inspector complete a final inspection of installed <br />stormwater treatment measure immediately after installation is complete. Tree <br />Wells - High flow-rate tree well filter products and/or high flow-rate media filter <br />products shall be certified by the Technical Assessment Protocol Ecology <br />(TAPE) of the Washington State Department of Ecology as meeting the TAPE <br />protocol General Use Level Designation for Basic Treatment. For TAPE <br />program information and use level designation statements. <br />40. Stormwater Management Plan (SWMP) – Applicant shall prepare a SWMP that <br />includes, at a minimum, exhibit(s) showing drainage areas and location of Low Impact <br />Development (LID) treatment measures; total project site area and total area of land <br />disturbed; total new and/or replaced impervious area; treatment measures and <br />hydraulic sizing calculations; a listing of source control and site design measures to <br />be implemented at the site; saturated hydraulic conductivity rate(s) at relevant <br />locations or hydrologic soil type (A, B, C or D) and source of information; elevation of <br />high seasonal groundwater table; and a brief summary of how the project is complying <br />with Provision C.3 of the MRP. [SDR][ENGINEERING] <br />41. Stormwater BMPs - Stormwater Pollution Prevention Program Best Management <br />Practices (BMPs) for construction shall be implemented to protect water quality, in <br />accordance with the approved Stormwater Pollution Prevention Plan (SWPPP). BMP <br />plan sheets are available electronically for inserting into project plans. <br />[SDR][ENGINEERING] <br /> <br />Street Infrastructure Improvements <br />