Laserfiche WebLink
ITEM 2 <br /> For the deck of the wharf complete $ 11 , 349 . 60 <br /> ITEM 3 <br /> ( a) For all cement concrete in place 13. 50 per cu. yd. <br /> (b ) For all reinforcing steel in cement concrete . 0355 per pound <br /> -+V. 4 <br /> ITS �. <br /> For all fill placed in foundation for <br /> Warehouse 1 . 05 per cu. yd. <br /> ITEM 5 , <br /> For asphalt concrete paving floor of <br /> Warehouse . 11 per sq . ft . <br /> ITEM 6 <br /> For the Warehouse complete 34 , 331 . 00 <br /> ITEM 7, <br /> For the complete installation of the 50 ton <br /> capacity truck scales 2 , 613. 00 <br /> ITEM 5 <br /> For Macadam pavement with bituminous macadam <br /> wearing surface , including all grading <br /> and preparation of subgrade <br /> . 07 per sq . ft . <br /> n <br /> Inasmuch as the Miller Construction Comnany of 3917 Mission Street , San Francisco , was <br /> the low bidder , the amount of the bid being under the estimate of the City <br /> Enpineeris office , Councilman McCarthy , seconded by Councilman Jones , proposed <br /> adoption of the following resolution with the understanding that the three <br /> lowest bids be retained , and the Clerk instructed to return the deposit checks <br /> of the other bidders. Carried. <br /> RESOLVED by the Council of the City of Redwood City that <br /> Whereas , said Council heretofore duly advertised for bids for <br /> furnishing all labor , material , transportation , and service for <br /> the performance of the construction of Harbor Terminal Imrprove- <br /> anent and a Warehouse , Including Necessary Equipment , at the Port <br /> of Redwood City , Redwood City , California , Federal Works Docket <br /> No . Calif. . 1895-F , Public Works Administration; <br /> AND , '7uEREAS , bids for said above described work were duly <br /> received and opened and computed in public ; <br /> AND , WizEREAS , it appears from the bids received for said <br /> above mentioned work that the MILLER CONSTRUCTION CO;PANY , 3917 <br /> Mission Street , San Francisco , was the lowest and best bidder <br /> therefor. <br /> NOW , THER" 'ORE , BE IT RESOLVED that the contract for said <br />