Laserfiche WebLink
C. Specific to the City of Redwood City, and based on preliminary design, the <br /> Project elements anticipated within City of Redwood City, include: <br /> (1) OCS poles. Installation of foundations, poles and appurtenances. <br /> (2) Stringing wire for OCS. Which will require temporary street closures when work <br /> occurs at an existing at-grade crossing. Specificity about the closures will be <br /> included in the Traffic Control Plan. <br /> (3) Construction of TPF located between MP 26.2 — 26.3 and is east of State Route <br /> 84 and the Right-of-Way (ROW). The location of this TPF is shown in Exhibit A <br /> as "SWS- 1 ". <br /> (4) Staging areas. The PCEP FEIR identified one potential staging area for the DB <br /> Contractor's use. The location of this staging area is east of State Route 84 and <br /> the Right-of-Way (ROW) between MP 26.2 — 26.4. This location is shown in <br /> Exhibit B. Additional staging areas will comply with applicable mitigation <br /> measures and will be coordinated with the City of Redwood City. <br /> SECTION 5: GENERAL COMMITMENTS <br /> A. The JPB will avoid affecting any City Improvements to the extent feasible. In the <br /> event a City Improvement requires modification and/or relocation, JPB shall be responsible for <br /> the design and construction of the City Improvement, subject to review and approval by the City. <br /> A comprehensive list of affected City Improvements will be prepared by the JPB, and will be <br /> provided to the City for review. The City agrees to cooperate with the JPB in the JPB 's <br /> preparation of such list to identify all City Improvements affected by the Project. Any <br /> replacement City Improvements will be of a similar kind and capacity to the existing facilities <br /> and compliant with existing City codes and standards. If City desires to increase or upgrade a <br /> City Improvement beyond its existing City codes and standards, it shall be responsible for any <br /> additional costs for that change. Existing City codes and standards shall be applied such that any <br /> replacement of City Improvements shall be of a size, material and specification meeting codes <br /> and standards in effect at the time of City's review and approval. Specifically, replacement City <br /> Improvements shall be of the minimum size, standard material, and specification as if new, <br /> except where meeting such size, material or other specification is waived by the City. The <br /> Parties will agree to a protocol for the review of plans and the inspection of affected City <br /> Improvements. The City has provided, and JPB has received, the document titled "Redwood <br /> City Preliminary Utility Information Regarding PCEP" (Exhibit D). <br /> B. In order to minimize disruption to the Caltrain passenger service during project <br /> construction as well as maximize protection of people and property, most of the Project work <br /> will be performed outside of the weekday peak commute hours. <br /> C. The JPB will provide the City with plan(s) addressing haul routes along city <br /> streets and roadways, and any staging areas or property owned or controlled by the City for City <br /> review and approval, which approval shall not be unreasonably withheld. JPB will document <br /> existing conditions by video and photographic record of the proposed and accepted haul routes <br /> ATTY/AGR/2016.206/JPB — CALTRAIN ELECTRIFICATION <br /> REV: 07-26-16 VR <br /> Page 5 of 14 <br />