My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt16 Peninsula Corridor Joint Powers Board - Electrification Project
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2016
>
Agmt16 Peninsula Corridor Joint Powers Board - Electrification Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2016 9:40:08 AM
Creation date
10/10/2016 4:03:08 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Peninsula Corridor Joint Power Board
PROJECT NAME
Peninsula Corridor Eletrification Project
RMP File Number
304
Date
9/30/2016
MO Ref
16-147
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
for comparison at the end of the project, in collaboration with the City. The JPB shall be <br /> responsible for damages to City roadways but only to the extent and in the event that use of the <br /> roadways for this Project creates damages that exceed ordinary wear and tear of the roadways. <br /> D. The JPB and the City will cooperate to reduce impacts of the Project on local <br /> police, fire, and emergency services. <br /> E. During construction of the Project, the JPB shall provide the City with a list of <br /> JPB personnel to be contacted in the event of an emergency on the Project construction site <br /> within the City. <br /> F. During construction of the Project, the JPB will take responsibility for <br /> maintaining the security of the JPB construction areas within the City in consultation with the <br /> City's Police Department, as necessary. <br /> G. For the duration of Project construction, the JPB shall assign a lead representative <br /> to handle Project-related complaints from City residents, City officials, and/or staff. The JPB <br /> shall provide written notice to the City and shall publicize the telephone number, fax number and <br /> E-mail address of the lead representative. The JPB shall make an initial response to all <br /> complaints within a reasonable period of time not to exceed 72 hours. For urgent matters, the <br /> JPB will make initial contact immediately. Follow-up of complaints will be completed within a <br /> reasonable time following initial contact with the complainant. The JPB shall take all reasonable <br /> actions to ensure that its lead representative is authorized to and does, in fact, ensure that <br /> corrective actions are implemented within a reasonable period of time following the <br /> determination that corrective actions are appropriate. <br /> H. Construction Noticing. The JPB will provide City with weekly construction <br /> updates via social media, the Caltrain website and by email. The JPB will provide a 60-calendar <br /> day advance notice for construction within the City of Redwood City. The JPB will provide an <br /> initial notice of road and driveway closures 14 calendar days in advance of the closure and the <br /> visual notifications for closures will be posted 72 hours in advance. <br /> I. Tree Trimming and Tree Removal. JPB will comply with City free replacement <br /> requirements for tree trimming or removal involving public or private property outside of JPB <br /> property, including obtaining any City permit legally required for such purpose. <br /> J. Encroachment Permits. JPB will obtain any City permit legally required for <br /> construction of the Project. The City shall not unreasonably withhold approval of the issuance of <br /> any such permit. <br /> SECTION 6: MITIGATION MEASURES <br /> The JPB will require the Design/Build Contractor to perform the work to implement the <br /> mitigation measures outlined in the Mitigation, Monitoring and Reporting Plan adopted by the <br /> JPB on January 8, 2015, to include the following: <br /> ATTY/AGR/2016.206/JPB — CALTRAIN ELECTRIFICATION <br /> REV: 07-26-16 VR <br /> Page 6 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.