My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt16 Peninsula Corridor Joint Powers Board - Electrification Project
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2016
>
Agmt16 Peninsula Corridor Joint Powers Board - Electrification Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2016 9:40:08 AM
Creation date
10/10/2016 4:03:08 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Peninsula Corridor Joint Power Board
PROJECT NAME
Peninsula Corridor Eletrification Project
RMP File Number
304
Date
9/30/2016
MO Ref
16-147
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
A. Mitigation Measure Aesthetics-2b: Aesthetic treatments for OCS poles, TPFs in <br /> sensitive visual locations and Overbridge Protection Barriers. <br /> (1) The JPB shall coordinate with the City of Redwood City to obtain their input into <br /> OCS pole design relative to station aesthetics. <br /> (2) Vegetative screening will be provided to visually buffer view of the Switching <br /> Station in the City of Redwood City (Option 2 in the PCEP FEIR). Acceptable <br /> screening that may be used includes: tree planting, fencing with creeping vines, <br /> landscape buffer planting or vegetative wall fence. The JPB will maintain the <br /> Right-of-Way screening on an on-going basis. <br /> B. Mitigation Measure Aesthetics-4a: Minimize spillover light during nighttime <br /> construction adjacent to residential neighborhoods. The JPB will direct any artificial lighting <br /> onto the worksite and away from adjacent residential areas at all times. <br /> C. Mitigation Measure Biology-5: A Tree Avoidance, Minimization, and <br /> Replacement Plan will be developed in consultation with a certified arborist and in consultation <br /> with cities, counties, and affected property owners along the Project. A complete field survey of <br /> the entire Project area will be completed to support the plan development by preparing a tree <br /> inventory for all affected areas. <br /> SECTION 7: CITY IMPROVEMENTS <br /> A. Construction Standards: The JPB is designing and constructing the Project. The <br /> design and construction of the Project shall conform with JPB's adopted standards, specifically <br /> JPB Standards Dated September 30th, 2011 and the Design/Build Contract Documents. Any <br /> work required to repair or replace City Improvements damaged or affected by the Project shall <br /> conform with the City's adopted codes and standards. If no City codes or standards exist for <br /> such work, it shall be designed to applicable Caltrans standards, or if no Caltrans standards <br /> apply, it shall be designed to such standards as JPB shall reasonably determine to apply, which <br /> standards shall be approved for application by the City. The JPB shall have the right to make <br /> changes to the design of work related to the City Improvements during construction, subject to <br /> the terms of this agreement, and subject to review and approval by the City. <br /> B. Design Review: The JPB will do a page-turn design review, or detailed <br /> walkthrough of the Project elements within the City of Redwood City limits at the 65% and <br /> Issued for Construction design levels prior to official submittal of Issued for Construction plans <br /> for final approval by the City. All comments received will be addressed prior to an official <br /> submittal of Issued for Construction plans. Design review for Project elements within the JPB <br /> Right-of-Way is for informational purposes only and is not for City approval. The City shall <br /> review and approve the design of any required work that alters or replaces City Improvements, <br /> both outside and within the JPB ROW, within 21 calendar days of receipt of the official <br /> submittal of Issued for Construction plans. With its official submittal of Issued for Construction <br /> ATTY/AG R/2016.206/JPB — CALTRAIN ELECTRIFICATION <br /> REV: 07-26-16 VR <br /> Page 7 of 14 <br />