Laserfiche WebLink
Transportation requirements. All traffic control, lane closure, and detour plans shall be submitted <br /> to the City for approval prior to commencement of any phase of construction requiring either <br /> traffic control or detour(s), which approval shall not be unreasonably withheld. The traffic <br /> control, lane closure, and detour plans shall specify the length of time that portions of City streets <br /> will likely be closed. <br /> A. Although certain City streets will, of necessity, be partially closed for some period <br /> during construction of the Project, the JPB will, to the greatest extent practicable, maintain in <br /> service, or cause to be maintained in service, all City streets and related City Improvements <br /> within the limits of the Project area in a manner reasonably satisfactory to the City. At a <br /> minimum, two-way service will be maintained on all City streets affected by the Project, unless <br /> otherwise agreed to by the JPB and the City. <br /> B. In its Contract Documents, the JPB will require its contractor(s) to submit traffic <br /> plans showing haul routes, temporary closures, and the method of traffic maintenance and <br /> staging to the City for approval, which approval shall not be unreasonably withheld. The City <br /> shall approve or disapprove the plans no later than twenty-one (21) calendar days following the <br /> City's receipt of such plans. <br /> C. In its Contract Documents, the JPB will, prior to the temporary closure to traffic <br /> of all or part of any street, sidewalk, or other public access, require that its contractor(s) provide <br /> at least fourteen (14) calendar days' notice of such closure to the City. Deviation from this <br /> fourteen (14) calendar day requirement may be permitted in bona fide emergency situations as <br /> determined by the JPB and the City. <br /> D. At least seventy two (72) hours prior to the temporary closure to traffic of all or <br /> part of any street, sidewalk, or other public access, the JPB will post notice of such closure. <br /> Such notice of any road closure shall include, at minimum, use of an electronic sign. The JPB <br /> will also provide closure-information fliers to residents, schools, and businesses within a three <br /> hundred (300) foot radius of any such closure. <br /> SECTION 11 : EROSION CONTROL PLAN <br /> The JPB shall provide an erosion control plan to retain sediments on site in accordance with the <br /> JPB's Storm Water Pollution Prevention Program and Contract Documents. All stockpiled <br /> earthwork shall be protected from wind and water erosion. Dust control shall be undertaken in <br /> accordance with the JPB Contract Documents and shall provide for dust, erosion and pollution <br /> control seven days a week, 24 hours a day for the duration of construction activities. <br /> SECTION 12: DESIGNATED AGENT OF THE PARTIES <br /> The City hereby designates the City Manager or his or her designee as the person authorized to <br /> review and approve all matters related to this agreement. The JPB's contact person for all <br /> matters related to this Agreement will be the Project Delivery Director or his designee. <br /> ATTY/AGR/2016.206/JPB — CALTRAIN ELECTRIFICATION <br /> REV: 07-26-16 VR <br /> Page 9 of 14 <br />