My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt16 Peninsula Corridor Joint Powers Board - Electrification Project
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2016
>
Agmt16 Peninsula Corridor Joint Powers Board - Electrification Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2016 9:40:08 AM
Creation date
10/10/2016 4:03:08 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Peninsula Corridor Joint Power Board
PROJECT NAME
Peninsula Corridor Eletrification Project
RMP File Number
304
Date
9/30/2016
MO Ref
16-147
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Transportation requirements. All traffic control, lane closure, and detour plans shall be submitted <br /> to the City for approval prior to commencement of any phase of construction requiring either <br /> traffic control or detour(s), which approval shall not be unreasonably withheld. The traffic <br /> control, lane closure, and detour plans shall specify the length of time that portions of City streets <br /> will likely be closed. <br /> A. Although certain City streets will, of necessity, be partially closed for some period <br /> during construction of the Project, the JPB will, to the greatest extent practicable, maintain in <br /> service, or cause to be maintained in service, all City streets and related City Improvements <br /> within the limits of the Project area in a manner reasonably satisfactory to the City. At a <br /> minimum, two-way service will be maintained on all City streets affected by the Project, unless <br /> otherwise agreed to by the JPB and the City. <br /> B. In its Contract Documents, the JPB will require its contractor(s) to submit traffic <br /> plans showing haul routes, temporary closures, and the method of traffic maintenance and <br /> staging to the City for approval, which approval shall not be unreasonably withheld. The City <br /> shall approve or disapprove the plans no later than twenty-one (21) calendar days following the <br /> City's receipt of such plans. <br /> C. In its Contract Documents, the JPB will, prior to the temporary closure to traffic <br /> of all or part of any street, sidewalk, or other public access, require that its contractor(s) provide <br /> at least fourteen (14) calendar days' notice of such closure to the City. Deviation from this <br /> fourteen (14) calendar day requirement may be permitted in bona fide emergency situations as <br /> determined by the JPB and the City. <br /> D. At least seventy two (72) hours prior to the temporary closure to traffic of all or <br /> part of any street, sidewalk, or other public access, the JPB will post notice of such closure. <br /> Such notice of any road closure shall include, at minimum, use of an electronic sign. The JPB <br /> will also provide closure-information fliers to residents, schools, and businesses within a three <br /> hundred (300) foot radius of any such closure. <br /> SECTION 11 : EROSION CONTROL PLAN <br /> The JPB shall provide an erosion control plan to retain sediments on site in accordance with the <br /> JPB's Storm Water Pollution Prevention Program and Contract Documents. All stockpiled <br /> earthwork shall be protected from wind and water erosion. Dust control shall be undertaken in <br /> accordance with the JPB Contract Documents and shall provide for dust, erosion and pollution <br /> control seven days a week, 24 hours a day for the duration of construction activities. <br /> SECTION 12: DESIGNATED AGENT OF THE PARTIES <br /> The City hereby designates the City Manager or his or her designee as the person authorized to <br /> review and approve all matters related to this agreement. The JPB's contact person for all <br /> matters related to this Agreement will be the Project Delivery Director or his designee. <br /> ATTY/AGR/2016.206/JPB — CALTRAIN ELECTRIFICATION <br /> REV: 07-26-16 VR <br /> Page 9 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.