My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2016-10-17 Closed and Special Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2016
>
AgdaPkt 2016-10-17 Closed and Special Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2016 9:39:39 AM
Creation date
10/13/2016 4:26:58 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council, Redevelopment Agency and Public Financing Authority
Date
10/17/2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
430
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Citywide Transportation Plan: Scope of Work B.B. - Page 14 <br /> October 2016 <br /> Page 9 of 21 <br /> - Caltrain Modernization Program <br /> - Caltrain Bike Parking Management Plan <br /> - Dumbarton Transportation Corridor Study <br /> - Grand Boulevard Initiative <br /> - C/CAG TDM grant <br /> As part of this task,the Fehr& Peers team will conduct a review of the City's existing transportation <br /> policies and practices, as well as previously identified transportation improvements. These will <br /> include policies articulated in the above documents and related transportation guidelines / <br /> standards used in the City. This review will be summarized in a technical working paper prepared <br /> by the project team. The working paper will focus on identifying conflicting policies and <br /> documenting existing citywide objectives for each travel mode. <br /> Task C.2: Multimodal Transportation Networks <br /> We will use existing data presented in the City's General Plan, the County Bicycle Network, the on- <br /> going Downtown Transit Center and Broadway Streetcar/Urban Circulator Study, and other City <br /> documents to summarize the City's existing multimodal network. We will develop maps for each <br /> travel mode, including walking, bicycling, transit, and automobiles. If available, we will also collect <br /> data on existing employee shuttle usage within the City. <br /> Task C.3:Automobile Traffic Volumes and Deficiencies <br /> Vehicle travel conditions will be initially assessed based on information presented in previous <br /> studies. Travel conditions will include a summary map of existing volumes, as well as intersections <br /> and corridors with high levels of traffic congestion and/or delay. This will inform locations where <br /> additional data should be collected as part of subsequent tasks, including looking at congested <br /> corridors and residential neighborhoods concerned with cut-through traffic. We assume that the <br /> City will provide traffic volume data from past studies that will be summarized for this task. <br /> Task C.4:Audit Representative, Recent Development Projects <br /> Travel characteristics of existing developments within the downtown and other core employment <br /> areas, will be surveyed to understand how employees and residents travel. We will conduct peak <br /> period trip generation surveys of 3-4 representative projects to understand local person trip <br /> generation rates by mode for recently constructed projects. Surveyed sites may include residential, <br /> commercial, or mixed-use developments. Optionally, we will develop one on-line survey for <br /> employees and one for major residential developments, with the understanding that the City will <br /> help facilitate the outreach to these stakeholders. <br />
The URL can be used to link to this page
Your browser does not support the video tag.