My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
RecDoc 2016-114851 575 El Camino Real_C&H Holdings_STMMA_
RedwoodCity
>
City Clerk
>
Recorded Docs CC&Rs
>
Recorded Docs 2013-2020 Additional sub folders
>
Recorded Documents 2013-2023 (additional sub folders)
>
Stormwater Treatment Measure Agreements
>
RecDoc 2016-114851 575 El Camino Real_C&H Holdings_STMMA_
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2016 2:14:36 PM
Creation date
11/2/2016 12:44:55 PM
Metadata
Fields
Template:
Recorded Docs
Recorded Docs - Type
Agreement
Subject
STMMA 575 El Camino Real (Burger King)
Doc Num
2016-114851 CONF
Rec Date
11/2/2016
Address
575 El Camino Real
Parties
C & H Holding Company, LLC
MO Ref
16-182
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit C El Camino Real <br /> • <br /> Stormwater Treatment Measure Operation and Maintenance <br /> Inspection Report to the City of Redwood City, California <br /> This report and attached Inspection and Maintenance Checklists document the inspection <br /> and maintenance conducted for the identified stormwater treatment measure(s) subject to <br /> the Maintenance Agreement between the City and the property owner during the annual <br /> reporting period indicated below. <br /> I. Property Information: <br /> Property Address or APN: 575 El Camino Real, Redwood City, CA 94063 <br /> Property Owner: C&H Holdings LLC <br /> II. Contact Information: <br /> Name of person to contact regarding this report: Chris Hsiung <br /> Phone number of contact person: Email: chsiung @comcast.net <br /> Address to which correspondence regarding this report should be directed: <br /> 5 Estates Dr. <br /> Millbrae, Ca 94030 <br /> III. Reporting Period: <br /> This report, with the attached completed inspection checklists, documents the inspections <br /> and maintenance of the identified treatment measures during the time period from <br /> to <br /> IV. Stormwater Treatment Measure Information: <br /> The following stormwater treatment measures (identified treatment measures) are located <br /> on the property identified above and are subject to the Maintenance Agreement: <br /> Identifying Type of Treatment Measure Location of Treatment Measure on the <br /> Number of Property <br /> Treatment <br /> Measure <br /> Bio I Rio-Retention NE corner of parking log <br /> Bio 2 Bio-Retention 50' south of Bio I <br /> Page 1 O&M Inspection Report <br /> ATTY/AGR.2016.255/C&H Holding Company, LLC - STMMA <br />
The URL can be used to link to this page
Your browser does not support the video tag.