Laserfiche WebLink
El Camino Real <br /> V. Summary of Inspections and Maintenance: <br /> Summarize the following information using the attached Inspection and Maintenance <br /> Checklists: <br /> Identifying Date of Operation and Maintenance Activities Additional Comments <br /> Number of Inspection Performed and Date(s) Conducted <br /> Treatment <br /> Measure <br /> 1 <br /> VI. Sediment Removal: <br /> Total amount of accumulated sediment removed from the stormwater treatment <br /> measure(s) during the reporting period: cubic yards. <br /> How was sediment disposed? <br /> ❑ landfill <br /> ❑ other location on-site as described in and allowed by the maintenance <br /> plan <br /> ❑ other, explain <br /> Page 2 O&M Inspection Report <br /> ATTY/AGR.2016.255/C&H Holding Company, LLC - STMMA <br />