Laserfiche WebLink
interface with the public shall be maintained in a neat, orderly, sanitary, and safe <br /> condition, and contractor shall at all times maintain the work area in a neat and <br /> orderly condition. <br /> 1.11 Working Day <br /> The Contractor's working day activities shall be limited to the hours between 7:30 <br /> a.m. and 4:00 p.m., Monday through Friday, unless otherwise specified by the City in <br /> writing. <br /> 2. Tasks <br /> Contractor is responsible for performing utility trench repair work in accordance with the City's <br /> Engineering Standards. Contractor is responsible for following the most up-to-date versions of <br /> the City's Engineering Standards, which are available online at <br /> http://www.redwoodcity.org/departments/community-development-department/engineering- <br /> transportation/engineering/engineering-standards. <br /> Work may include concrete and asphalt repairs, irrigation system repair, drain line installation, <br /> and additional sub-base excavation. <br /> 2.1. Notification to Residents and Businesses <br /> Contractor is responsible for performing all work so that it meets or exceeds the <br /> standards established in Section 01350 Notification to Residents and Businesses of <br /> Redwood City's Standard Technical Specifications. <br /> 2.2. Traffic Regulations <br /> Contractor is responsible for performing all work so that it meets or exceeds the <br /> standards established in Section 01550 Traffic Regulations of Redwood City's <br /> Standard Technical Specifications. <br /> 2.3. Stormwater Pollution Prevention <br /> Contractor is responsible for performing all work so that it meets or exceeds the <br /> standards established in Section 02133 Stormwater Pollution Prevention of Redwood <br /> City' s Standard Technical Specifications. <br /> 2.4. Trenching and Backfill <br /> Contractor is responsible for performing all work so that it meets or exceeds the <br /> standards established in Section 02202 Trenching and Backfill of Redwood City's <br /> Standard Technical Specifications. <br /> 2.5. Removals, Grading, and Earthwork <br /> Contractor is responsible for performing all work so that it meets or exceeds the <br /> standards established in Section 02220 Grading and Earthwork of Redwood City's <br /> Standard Technical Specifications. <br /> Page 11 of 13 <br /> REV: 10-19-16 RL <br /> ATTY/AGR.2016.300/Bay Area Paving Co., Inc. <br />