Laserfiche WebLink
<br />Proposal: Topaz Pipeline Corrosion Control System Retrofit <br /> <br />Proposal: <br /> <br />Topaz Pipeline Corrosion Control System <br />Retrofit <br /> <br />Task 1 - System Evaluation <br /> <br />a) A review would be made of the historical information available for the City of Redwood City <br />in terms of the history of corrosion control for the Topaz Pipeline.* <br /> <br />b) Meet with City to review results of initial site visit. * <br /> <br />c) Conduct field testing on existing cathodic protection system for Topaz Line.* <br /> <br />d) Prepare Basis of Design Report which would list the recommended repairs for the existing <br /> <br />cathodic protection system. <br /> <br />* Included in Master Plan Contract. <br /> <br />Task 2 - Prepare Construction Drawings <br /> <br />a) Prepare 90% and [mal plans for the repair of the existing cathodic protection system on <br />Topaz. The drawings would also include any planned additions to the CP system. <br /> <br />b) Prepare 90% and [mal specifications for the repair of the existing cathodic protection system <br />on Topaz. <br /> <br />c) Prepare 90% and [mal estlmate of probable cost for the repalr of the existing cathodic <br />protection system on Topaz. <br /> <br />Deliverables: <br /> <br />One set of bond full size originals and one hard copy of technical specifications <br />and estimate of probable cost. <br />Electronic versions of drawing in AutoCAD, technical specification in Microsoft <br />Word and estimate of probable cost in Microsoft Excel. <br /> <br />Task 3 - Bidding Assistance <br /> <br />a) Replay to Pre Bid questions from contractors. <br /> <br />b) Review Bid Results and provide input to the City. <br /> <br />rfi\ CONSULTING <br />\t:.I ENGINEERS, INC. <br /> <br />(i,'illn!""!,,,c!n,-e ['I(,'.H'IT"II"n <br /> <br />1 <br /> <br />"T <br /> <br />Y" <br /> <br />'t. <br />