<br />EXHIBIT "A" <br /> <br />Proposal: Topaz Pipeline Upgrade <br /> <br />Contract Amendment Proposal <br />Topaz Pipeline Corrosion Control System Retrofit Project <br />Original Contract Dated August 26, 2004 <br />P.O. No. 46135 <br /> <br />Introduction: <br /> <br />The following proposal is being made in response to additional project requirements to <br />complete the final documents and provide additional assistance to the City for inspection at key <br />points during the construction. <br /> <br />The original contract amount is $36,148 <br /> <br />Task 1 - Unchanged <br /> <br />Task 2 - Prepare Construction Drawings <br /> <br />d) Additional work required to complete [mal design Documents - <br /> <br />$5.000 <br /> <br />Deliverables: <br /> <br />One set of bond full size originals, one hard copy of technical specifications and <br />estimate of probable cost. <br />Electronic versions of drawing in AutoCAD, technical specification in Microsoft <br />Word and estimate of probable cost in Microsoft Excel. <br /> <br />Task 3 - Unchanged <br /> <br />Task 4 - Assistance During Construction <br /> <br />d) Specialized inspection during key construction points - <br /> <br />$2.640 <br /> <br />1. Installation of Deep Wells <br />2. Installation of Rectifiers <br />3. Installation of Test Stations <br />4. Excavation of In Line Valves <br /> <br />Task 5 - Unchanged <br /> <br /> <br />$7.640 <br /> <br />Date: ð/U/Jpe?5'- <br />, <br /> <br />ose L. Villalobos, President <br />V & A Consulting Engineers, Inc. <br /> <br />R\ CONSULTING <br />\!iI ENGINEERS, INC. <br /> <br />Or,a Infrastructure Preservation <br /> <br />1 <br /> <br />----'.T <br />