<br />Proposal: Topaz Pipeline Upgrade <br /> <br /> LEVEL OF EFFORT 3/25/05 <br /> CITY OF REDWOOD CITY ZONE 1 TOPAZ PIPELINE UPGRADE <br /> Original Contract <br />Task Description Principal Project Project Assistant Assistant Contract Amend- <br /> in Charge Manager Engineer Engineer Engineer Clerical Total Total ment <br /> /CADD Hours Hours By Task <br />Task 1 - System Evaluation <br />a Conduct Field Verification' 0 $0 <br />b Meet with City to Review Findings' 0 $0 <br />c Conduct Field Testing' 0 $0 <br />d Prepare Basis of Design 4 8 24 4 8 48 $5,240 <br />ReDor! <br /> Task 1 Subtotal 0 4 8 24 4 8 48 $5,240 <br />Task 2 - Prepare Construction Documents <br />a Prepare Design Plans 8 16 40 32 4 100 $11,520 <br />b Prepare Specifications 4 4 8 4 8 28 $2,960 <br />c Prepare Cost Estimate 2 4 8 2 2 18 $2,060 <br />a Prepare Final Design Documents 6 8 16 8 6 44 $5,000 <br /> Task 2 Subtotal 0 20 32 72 46 20 146 $16,540 <br />Task 3 - Bidding Assistance <br />a Reply to Prebid Questions 4 4 8 $1,160 <br />b Review Bid Results 2 4 6 $840 <br /> Task 3 Subtotal 0 6 8 0 0 0 14 $2,000 <br />Task 4 - Assistance During Construction <br />a Reply to RFI's 2 8 4 4 4 22 $2,480 <br />b Submittal Review 2 16 8 4 2 32 $3,840 <br />c Specialized Inspection 2 16 4 22 $2,640 <br />d Observation of Final System Checkout 2 8 2 12 $1,480 <br /> Task 4 Subtotal 0 8 48 12 8 12 88 $7,800 <br />Task 5 - Project Management <br />a Prepare Project Management Plan 4 2 6 $760 <br />b Progress Meetings,Agenda, 6 2 8 $1,080 <br />and Minutes (3 Meetings) <br />c Monthly Reports (2 Meetings) 2 2 4 $440 <br />d Decision Log (2 Months) 2 2 4 $440 <br /> Task 5 Subtotal 0 14 0 0 0 8 22 $2,720 <br /> Subtotal All Tasks 0 52 96 108 58 48 362 $34,300 $7,640 <br /> Hourly $180 $160 $130 $110 $110 $60 <br /> Total Direct Labor $0 $8,320 $12,480 $11,880 $6,380 $2,880 $41,940 <br /> Other Direct Costs <br /> Auto and Field Truck Mileage $0.36 /Mile 300 Miles $108 <br /> Field Truck $80.00 /Day 3 Days $240 <br /> Office Expenses (Specialty Printing/Reproduction/Shipping) $1,500 <br /> Subtotal Other Direct Costs ODCs Subtotal $1,848 $1,848 <br /> GRAND TOTAL ESTIMATED COST Grand Total $43,788 $36,148 $7,640 <br /> , Included in Master Plan Original + Original Amendment <br /> Amendment Contract <br />I} CONSULTING <br />.. ENGINEERS, INC. <br />Cillit Infrastructure Preservation <br /> 2 <br /> <br />T <br />