My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2016-12-12 Closed and Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2016
>
AgdaPkt 2016-12-12 Closed and Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2017 5:17:37 PM
Creation date
12/8/2016 5:27:50 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Minutes
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
12/12/2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.1.A. - Page 20 <br />within each reach. The Refined Improvement Matrix and Map will also provide a <br />cursory evaluation the severity of the identified deficiencies for prioritizing repairs, <br />consistent with the prioritization presented in the 2012 Deficiency Report. <br />This document will provide a clear delineation of the types of deficiencies, the <br />location of the deficiencies, the location and priority of the recommended repairs, <br />preliminary repair scope and repair detail. The Refined Improvements Matrix will <br />be used to develop a very preliminary cost estimate based on a simple unit cost, <br />prior to the field survey. <br />The Refined Improvement Matrix and Map, and preliminary cost will be submitted <br />to the City and reviewed in a meeting. <br />Task 2.4 — Field Surveys <br />Based on the refined recommendations in the Refined Improvement Matrix, the <br />Wood Rodgers Team will conduct field surveys as required for each project <br />reach as described below: <br />Reach 1: field survey the concrete -lined portion of the Redwood Creek <br />Jefferson Branch between EI Camino Real and Clinton Street <br />(approximately 1,000 If). <br />Reach 2: field survey the concrete -lined portion of the Redwood Creek <br />Redwood Branch between Oak and Hudson Street (approximately 1,500 <br />If). <br />The surveys will depend on available as -built for their basis and will extend only <br />as needed based on the initial refined recommended improvements. The <br />surveys include invert and top of wall elevations at locations of the required <br />improvements. <br />Task 2.5 — Property Lines <br />Review and investigate entitlements, easements, and encumbrances as <br />necessary. Wood Rodgers will review and study recorded maps to identify <br />mitigation requirements. These will be added to the map only as needed, based <br />on the Refined Improvement Matrix/Map. If title research or reports are needed <br />for completion of the project, Wood Rodgers will order the reports and pass on <br />the costs to the City. The costs assume that only one limited segment of one <br />project reach will require this service. <br />Task 2.6 — Base Map <br />Prepare the topographic base map for the project reaches. All surface features, <br />utility information, and base mapping approximately 20 feet beyond the limits of <br />the project shall be included. 1 -foot contours will be generated for the project <br />limits, with property lines and easements shown as necessary. Wood Rodgers <br />Survey and Mapping team will prepare up-to-date documents employing GIS and <br />REV: 12-01.16 RL <br />Page 16 of 23 <br />ATTY/AGR.2016.325/Wood Rodgers, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.