Laserfiche WebLink
6.1.A. - Page 25 <br />perform all reproduction, or will contract that a local business for reproduction <br />services, to make the documents available to potential bidders. <br />Wood Rodgers will provide one (1) hard copy set of full-size 100% design plans <br />and specifications for the Project. The final design submittal will serve as the <br />Project Contract Document set once approved and accepted by the City. The <br />Contract Document set will bear the responsible engineer's wet stamp and <br />signature with a license expiration date. Wood Rodgers will also provide an <br />electronic copy of the drawings in AutoCAD (version 2015 or latest version) and <br />in PDF format, specifications in Word, calculations, cost estimate, and probable <br />construction schedule in Excel and PDF. <br />Task 5 — BID SUPPORT AND CONSTRUCTION SERVICES <br />Wood Rodgers Team will provide clarifications during the bid phase, attend and <br />conduct the pre-bid meeting, respond to questions from contractors, and issue <br />addenda as directed by the City. <br />The Wood Rodgers Team will attend and conduct a pre-bid meeting and <br />coordinate with the City to respond to request for information or clarification <br />during bidding. <br />The Wood Rodgers Team will attend the pre -construction meeting, and will <br />conduct three (3) site visits during construction as requested at defined <br />milestones. <br />The Wood Rodgers Team will review shop drawings and supporting calculations, <br />change orders, RFIs, and provide written responses to the City. <br />The Team will also conduct a final inspection and assist with the punch list. <br />The Team will prepare "as -built" drawings based on construction notes and the <br />limited field review, The Team will perform limited field surveys to support the <br />as-builts if required. <br />Task 6 — ADDITIONAL GEOTECHNICAL SERVICES <br />At the direction of the City, Wood Rodgers Team will provide 2 additional <br />geotechnical borings. The geotechnical reports will include results from these <br />additional borings. <br />Task 7 — ADDITIONAL CONSTRUCTION SUPPORT SERVICES <br />At the direction of the City, Wood Rodgers Team will provide additional Bid and <br />Construction Support services to assist with the 2016 Redwood Creek Repair <br />and Rehabilitation Project. <br />REV: 12-01-16 RL <br />Page 21 of 23 <br />ATTY/AGR.2016.325/Wood Rodgers, Inc. <br />