Laserfiche WebLink
6.1.A. - Page 26 <br />E. <br />TIME SCHEDULE <br />The following is the consultant's summary of the proposed work schedule for the <br />project: <br />Task 1 — PROJECT MANAGEMENT <br />239 <br />1 Thu 12/1/16 <br />1 Tue 10/31/16 <br />1.1 Design Criteria <br />239 <br />Thu 12/1/16 <br />Tue 10/31/16 <br />1.2 Quality Assurance <br />239 <br />Thu 12/1/16 <br />Tue 10/31/16 <br />j 1.3 Meetings <br />239 <br />Thu 12/1116 <br />Tue 10/31/16 <br />1.4 Invoicinq/Project Status Reports <br />239 <br />Thu 1211/16 <br />Tue 10/31/16 <br />Task 2 — SURVEYING AND UTILITIES RESEARCH <br />60 <br />Thu 12/1/16 <br />Wed 2/22/17 <br />2.1 CollectlReview Documents <br />40 <br />Thu 12/1116 <br />Wed 1/25117 <br />2.2 Site Visits <br />20 <br />Thu 12/15/16 <br />! Wed 1111117 <br />2.3 Refined Improvements Matrix/Map, Cost <br />25 <br />Thu 1211116 <br />Wed 114117 <br />2.4 Field Surveys <br />30 <br />Mon 1/2/16 <br />Fri 2/10/17 <br />2.5 Property Lines <br />60 <br />I Thu 12/1/16 <br />Wed 2/22117 <br />2.6 Base Map <br />60 <br />Thu 1211/16 <br />Wed 2/22/17 <br />Task 3 — INITIAL DESIGN (50% & 75% DESIGN <br />90 <br />Thu 12/1116 <br />Wed 4/5/17 <br />SUBMITTAL <br />3.1 Basis of Deesign Memorandum <br />42 <br />Thu 12/1116 <br />Fri 1127117 <br />3.2 Geotechnical Reports <br />80 <br />Thu 12/15/16 <br />Fri 3/3/17`" <br />3.3 50% Design Submittal <br />45 <br />Mon 112/16 <br />Fri 313117 <br />! 75% Design Submittal <br />21 <br />Fri 2117/17 <br />Fri 313/17 <br />Task 4 — FINAL DESIGN (100% DESIGN <br />11 <br />Fri 3/17/17 <br />Fri 3/31117 <br />SUBMITTAL) <br />Construction Documents <br />0 <br />Fri 3/31/17 <br />Fri 3/31/17 <br />Task 5 — BID SUPPORT AND CONSTRUCTION <br />148 <br />Mon 4/3/17 <br />Tue 10/31/17 <br />SERVICES <br />Construction <br />109 <br />Thu 6/1117 <br />Thu 10/31/17 <br />Task 6 — ADDITIONAL GEOTECHNICAL SERVICES <br />- <br />- <br />- <br />Task 7 — ADDITIONAL CONSTRUCTION SUPPORT <br />- <br />- <br />- <br />SERVICES <br />***Contingency extension to 3/31/17 <br />COMPENSATION <br />Consultant shall perform the Scope of Work described for an amount not to <br />exceed two hundred thirty-five thousand, six hundred seventy-four and 001100 <br />dollars ($235,674). Consultant shall be paid for time and materials spent at the <br />end of the month payable within (30) days following City's receipt of acceptable <br />deliverables. <br />Consultant's detailed breakdown of their level of effort and fees is shown below: <br />REV: 12-01-16 RL <br />Page 22 of 23 <br />ATTY/AGR.2016.325NVood Rodgers, Inc. <br />