Laserfiche WebLink
6A.B. - Page 20 <br />H. NEW MATERIAL -ACCEPTANCE <br />The units herein specified shall be constructed throughout of new parts and materials, which <br />shall have seen no service other than that necessary for factory tests, unless otherwise <br />allowed in the Bid Specification. Items purchased hereunder will be subject to final <br />inspection and acceptance at delivery destination as set forth in this Notice Inviting Bids. <br />I. LOWEST RESPONSIBLE BIDDER <br />In order to promote the policy declared above, contracts will be awarded only to such <br />Bidders as are determined to meet the following qualifications of lowest most responsible <br />Bidder. <br />The award may be to the lowest most responsible Bidder or other Bidder. In determining <br />who the award is to be made, the awarding authority may consider, in addition to the <br />Submitted Bid received, the experience of the Bidder for the particular service sought, the <br />quality of work that the Bidder has done, the quality of the product or materials provided by <br />the Bidder, the ability of the Bidder to complete the project in a timely manner, the safety <br />compliance record of the Bidder, and the insurance carried by the Bidder. <br />J. AWARD OF CONTRACT OR REJECTION OF BIDS <br />The City reserves the right to amend or reject any or all bids and also to select, modify, or <br />reject any of the bid items as the City sees in its best interest. <br />Whenever quantities of individual items are involved the City reserves the right to make <br />single awards or separate items in an aggregate of several items to various vendors. <br />K. GUARANTEE <br />The Bidder warrants and guarantees that all equipment, materials, vehicles or supplies used <br />or furnished and all workmanship are of the type and quality specified herein. The Bidder <br />further guarantees that any latent fault in construction or defective material discovered <br />within one year after acceptance of the work shall be remedied by Bidder without cost to the <br />City, upon written notice given to Bidder. Other subsequent latent defects shall be covered <br />by responsibilities set forth in the law. <br />In the event of failure to comply with the above-mentioned conditions within a reasonable <br />time after notice, the City will have the defects repaired and made good at the expense of the <br />Bidder, who agrees to pay the costs and charges therefore immediately upon demand. <br />The signing of this agreement by the Bidder shall constitute agreement to the above <br />guarantees. <br />L. WARRANTY <br />Bidders should specify in their Bid Submission; <br />a. Details surrounding the manufacturer's standard warranty on all materials. <br />b. Details surrounding any additional warranties offered on the proposed materials. <br />M. PREPARATION FOR SHIPMENT <br />The Bidder shall prepare all articles and materials for shipment in such a manner as to <br />protect them from damage in transit, and shall be responsible for and repair all damaged <br />NOTICE INVITING BIDS <br />2016-2017 STORM WATER PUMP REPLACEMENT 4 of 12 <br />