My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt16 Huffman Broadway Group, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2016
>
Under 60K
>
Agmt16 Huffman Broadway Group, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2016 3:19:06 PM
Creation date
12/19/2016 3:18:10 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Huffman Broadway Group, Inc.
PROJECT NAME
Redwood Creek Improveent Project- Permit compliance support services
RMP File Number
304.5
Date
12/16/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Task 3 - BAT AVOIDANCE (AS-NEEDED). <br />HBG will conduct a habitat assessment for bats at the 1400 -foot subsurface concrete box culvert <br />along the 2016 Redwood Branch from Maple Street to Broadway and any road crossings at the <br />remaining three project reaches (2016 Jefferson Branch, Reach 1, and Reach 2). In accordance <br />with Section 2.35 in the Streambed Alteration Agreement, a habitat assessment for bats is <br />required at work sites where culverts, bridges, and structures would be disturbed. The <br />assessment shall include a Visual inspection within 50 feet of the work area for potential bat <br />roosting features no more than 48 hours prior to start of work. Once surveys are completed, HBG <br />will prepare a summary report of the bat survey results and submit it to the CDFW as required. <br />Task Assumptions <br />1. Three (3) site visit will be required to complete this task. <br />2. Four (4) hours plus expenses to conduct survey on Jefferson Branch Reach 1 and <br />Redwood Branch Reach 1 project sites. <br />3. Four (4) hours plus expenses to conduct survey on Jefferson Branch Reach 2 project site. <br />4. Four (4) hours plus expenses to conduct survey on Redwood Branch Reach 2 project <br />site. <br />5. Prepare two (2) summary letter reports of survey results for total of 4 hours (2 hours per <br />report). <br />Task 4 - ENVIRONMENTAL PERMIT COMPLIANCE SUPPORT (AS -NEEDED) <br />HBG will provide support, on an as -needed basis, to ensure implementation of the Project is in <br />compliance with the terms and conditions of permits including, but not limited to, USACE NW P-3 <br />Maintenance authorization, RWQCB Water Quality Certification, and CDFW streambed Alteration <br />Agreement. <br />Task Assumptions <br />1. Attend one (1) meeting with City staff; assumes six (6) hours plus expenses will be <br />needed to complete this task. <br />2. Additional one (1) hour of technical support (e.g. review notification reports, technical <br />questions, conference calls, emails etc.). <br />D. COST SCHEDULE AND PAYMENTS <br />HGB will bill City as needed for time and materials. The following is HGB's summary of the <br />proposed cost schedule for the project: <br />REV: 12-08-16 RL <br />Page 8 of 9 <br />ATTY/AGR.2016.327/Huffman-Broadway Group, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.