My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt04 Kennedy Jenks
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2004
>
Agmt04 Kennedy Jenks
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2017 10:36:18 AM
Creation date
9/7/2004 8:42:33 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Kennedy Jenks Consultants
PROJECT NAME
recycled water
RMP File Number
304 (was an 802)
Date
9/3/2004
MO Ref
04-163 05-165
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />SCOPE OF WORK: <br />Kennedy/Jenks Consultants ("Consultant") shall provide professional and technical <br />services for final design including preparation of plans, specifications and contract <br />documents; and office engineering assistance during bidding to complete the Project as <br />described herein. <br />The Consultant will directly subconsultant for aerial photography and mapping, <br />supplemental surveying, and potholing existing utilities. The City will contract with other <br />consultants/providers for reproduction of bidding documents. The Consultant will <br />coordinate with the City staff, consultants and service providers. <br />The City will provide traffic control and street opening permits as required by Consultant <br />during design for streets within the City of Redwood City. <br />Design of recycled water customers onsite retrofit facilities and major utility relocations, <br />and investigations of rights-of-way acquisition and hazardous materials is not included <br />in the scope of work. The locations of the laterals will be coordinated with the retrofit <br />work. The City will investigate rights-of-way acquisition and will obtain necessary <br />easements. <br />The following items would constitute a change in the scope of work and so would <br />require a modification to the budget: <br />· Delays in schedule. <br />· Increases in pipeline lengths. <br />· Increase in number of laterals. <br />· Additional permitting. <br />Task 1 - Project Management <br />This task includes project management and administrative services necessary to <br />complete the tasks defined in this scope of services (Tasks 2 to 5). These tasks <br />include managing in-house staff and subconsultants; monitoring the scope, schedule <br />and budget; planning and monitoring project activities; and preparing monthly budget <br />status reports including invoices for services. If the project work extends beyond 12 <br />months, or the scope of services is increased, a budget augmentation will be required <br />for project management. <br />Task 1.1 - Work Plan and Invoices <br />Consultant shall prepare a work plan for the project, including a quality assurance plan. <br />Consultant shall also prepare monthly invoices, including a brief summary of the project <br />status, and will provide monthly updates to the project web site. <br />Task 1.2 - Project Meetings <br />Agreement over $10K 14 <br />KennedyJenks Rev-2 112603 <br />
The URL can be used to link to this page
Your browser does not support the video tag.