My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt04 Kennedy Jenks
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2004
>
Agmt04 Kennedy Jenks
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2017 10:36:18 AM
Creation date
9/7/2004 8:42:33 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Kennedy Jenks Consultants
PROJECT NAME
recycled water
RMP File Number
304 (was an 802)
Date
9/3/2004
MO Ref
04-163 05-165
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Consultant shall coordinate the work between various disciplines and with the <br />subconsultants through 6 in-house project status meetings. <br />Task 1.3 - City Progress Meetings <br />Consultant shall coordinate the work with the City through meetings and <br />correspondence. It is anticipated that 6, two-hour-Iong project status/coordination <br />meetings will be conducted with the City over a 12-month period. Consultant's project <br />manager will attend each meeting. Kennedy/Jenks's project engineer and selected <br />subconsultant representatives may also attend specific meetings at the request of the <br />Kennedy/Jenks's project manager, depending upon project activity. It is also <br />anticipated that Consultant will participate in periodic conference calls throughout the <br />project, up to one 30 minute conference call every other week. <br />Task 1.4 - QA/QC Program <br />Consultant shall develop and execute a Quality Assurance/Quality Control (QA/QC) <br />Program specific to this project. Quality reviews will be conducted prior to the <br />Preliminary, 90%, and 100% submittals. <br />Task 1.5 - Schedule <br />Consultant shall prepare a gantt chart schedule for design and construction. The <br />schedule format will be coordinated with the City's program manager. The schedule will <br />be updated monthly and will be submitted along with the monthly invoices. <br />Task 2 - Preliminary Design <br />Consultant shall provide the following work which constitutes a preliminary level of <br />design development: <br />1. Research and obtain utility record drawings and other pertinent right-of-way and <br />utility information. City will coordinate access to City files. <br />2. Perform field investigations of the proposed pipeline alignment, including up to 3 <br />days of walking the alignment with City staff. <br />3. Identify utility conflicts along the proposed alignment, and identify up to 60 utility <br />locations for potholing. <br />4. Review existing geotechnical investigations provided by City, and incorporate the <br />City's standard pipe installation and corrosion protection details into the design. Per <br />the City's request, neither a geotechnical investigation nor a corrosion evaluation will <br />be conducted for this project. <br />5. Coordinate surveying and mapping to be performed by our subcontractor, Mark <br />Thomas & Company: <br />Agreement over $10K 15 <br />KennedyJenks Rev-2 112603 <br />
The URL can be used to link to this page
Your browser does not support the video tag.