My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt04 Kennedy Jenks
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2004
>
Agmt04 Kennedy Jenks
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2017 10:36:18 AM
Creation date
9/7/2004 8:42:33 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Kennedy Jenks Consultants
PROJECT NAME
recycled water
RMP File Number
304 (was an 802)
Date
9/3/2004
MO Ref
04-163 05-165
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />EXHIBIT "A" <br />SCOPE OF SERVICES <br />AGREEMENT FOR PROFESSIONAL ENGINEERING SERVICES <br />KENNEDY/JENKS CONSULTANTS <br /> <br />REDWOOD CITY RECYCLED WATER PROJECT <br />CUSTOMER RETROFIT AND PROGRAM SUPPORT SERVICES <br /> <br />BACKGROUND <br />The Redwood City Recycled Water Project ("Project") will be implemented in multiple phases <br />over the next several years, beginning with some recycled water delivery in the 2006 irrigation <br />season. This scope of services has been designed in close collaboration with city staff to <br />reflect and fully implement: <br />. Project "Alternative TF", as described in the Recycled Water Task Force Report and as <br />unanimously accepted by the City Council on March 25, 2004. <br />. Agreement for Production and Delivery of Recycled Water ("Agreement") between the <br />South Bayside System Authority (SBSA) and the City of Redwood City as approved by the <br />City Council on July 26, 2004 and by the SBSA Commission on August 3, 2004. All of the <br />legal, operational and financial details of the long-term partnership arrangement between <br />the two agencies are embodied in this agreement. <br />. City Council policies on the use of recycled water made to date, such as the prohibition on <br />mandatory use by existing residential customers. <br />. Engineering Report dated August 2004, and currently under review by the State of <br />California Regional Water Quality Control Board, the State Department of Health Services <br />(DHS), and the County of San Mateo Health Services Agency. <br /> <br />The major components of the Project are: <br /> <br />1. Treatment improvements consisting of filter modifications, chemical feed addition and <br />filtered water line at the SBSA site - owned and operated by SBSA <br /> <br />2. Disinfection facility consisting of new chlorine contact chamber at the SBSA site - owned <br />by Redwood City, operated by SBSA <br /> <br />3. Storage and pumping facilities located inside the SBSA plant property (includes a back- <br />up supply line for potable water) - owned and operated by Redwood City <br /> <br />4. Distribution system consisting of new transmission pipelines throughout the water service <br />area, in street rights-of-ways - owned and operated by Redwood City <br /> <br />5. Customer site retrofits for each existing private or public site with a landscape irrigation <br />meter. Retrofits will occur as each property owner has agreed to convert to recycled water <br />for landscape irrigation and industrial uses. <br /> <br />· This scope of services is specifically for the work required to complete the first major phase <br />of component number five above, while engineering services for number four are to be <br />provided under a separate, companion professional services agreement. <br /> <br />LOCATION AND DESCRIPTION OF PROJECT: <br /> <br />Agreement over $1 OK <br />KennedyJenks Rev-2 112603 <br /> <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.