My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso PC16-23 PC 0116 Reso CEQA - Sandpiper
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2016
>
Reso PC16-23 PC 0116 Reso CEQA - Sandpiper
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2017 1:00:25 PM
Creation date
1/3/2017 12:05:46 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
Planning Commission
Date
12/6/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
139
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Section 4.0 — Environmental Setting and Discussion of lnnoacts <br />spaces on the City property. An existing joint use agreement between the City and District allows <br />District use of the 49 parking spaces on the City property for school operations. <br />4.16.1.4 Intersection Operations <br />Study Intersections <br />Traffic conditions at the intersections in the project area that would be affected by project -generated <br />traffic were evaluated using level of service (LOS). Traffic conditions at the study intersections were <br />analyzed for the weekday AM and PM peak periods of project -generated traffic. Except for <br />Wednesdays, drop-off operations occur between 8:00 AM and 9:00 AM, and pick-up operations <br />occur between 2:30 PM and 3:00 PM. The morning peak period for school operations coincides with <br />the morning peak period for commute traffic (7:00 AM to 9:00 AM). The afternoon peak period for <br />school operations does not coincide with the afternoon peak period for commute traffic (4:00 PM to <br />6:00 PM). During the PM peak period for commute traffic, most school -related activities have <br />ended. Traffic conditions on the study intersections for both the AM (7:00 AM to 9:00 AM) and PM <br />(2:00 PM to 4:00 PM) peak periods of school operations were analyzed. The study intersections are <br />shown in Figure 4.16-1 and identified below. <br />1. Marlin Drive & Redwood Shores Parkway (all -way stop -controlled) <br />2. Shell Parkway & Redwood Shores Parkway (all -way stop -controlled) <br />3. Egret Lane & Redwood Shores Parkway (all -way stop -controlled) <br />4. Sandpiper Driveway (West) & Redwood Shores Parkway (one-way stop -controlled) <br />5. Sandpiper Driveway (East) & Redwood Shores Parkway (two-way stop -controlled) <br />6. Shearwater Parkway & Redwood Shores Parkway (all -way stop -controlled) <br />Traffic Scenarios Analyzed <br />Traffic conditions at the study intersections were evaluated for the three following scenarios: existing <br />conditions, existing plus project conditions, and cumulative conditions. <br />Level of Service <br />Traffic conditions at the project site were evaluated using level of service (LOS). LOS is a <br />qualitative description of operating conditions ranging from LOS A (free-flow conditions with little <br />or no delay) to LOS F (jammed conditions with excessive delays). The analysis method for <br />unsignalized intersections is described below. <br />City of Redwood City 89 Initial Study/Mitigated Negative Declaration <br />Sandpiper Elementary School Facilities Expansion November 2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.