My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso PC16-23 PC 0116 Reso CEQA - Sandpiper
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2016
>
Reso PC16-23 PC 0116 Reso CEQA - Sandpiper
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2017 1:00:25 PM
Creation date
1/3/2017 12:05:46 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
Planning Commission
Date
12/6/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
139
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Section 4.o—Environmental Setting and Discussion oflnzpaca <br />4.6.3.3 Construction Impacts (Checklist Question 2) <br />Project construction would disturb the ground and expose soils, thereby, increasing the potential for <br />wind or water related erosion at the site until construction is complete. As discussed in Section 4.3, <br />Air Quality and Section 4.9, Hydrology and Water Quality, the proposed project would be required to <br />implement the BAAQMD Basic Construction Mitigation Measures identified in MM ALR -1 and <br />RWQCB Best Management Practices that, upon implementation, would reduce project fugitive dust, <br />erosion, and water quality impacts to a less than significant level. (Less Than Significant Impact <br />with Mitigation Incorporated) <br />4.6.3.4 Other Hazards (Checklist Questions 3 and 5) <br />The project site and surrounding area are flat. Therefore, there is no potential for landslides to affect <br />the proposed project. The proposed project would include infrastructure to adequately accommodate <br />the disposal of wastewater. The project does not include septic tanks or alternative wastewater <br />disposal systems. (No Impact) <br />4.6.4 Conclusion <br />The proposed project, with implementation of the recommendations in the design -specific <br />geotechnical report prepared for the proposed project and identified in MM GEO-1, BAAQMD Basic <br />Construction Mitigation Measures, and RWQCB Best Management Practices, would not result in <br />significant geology and soils impacts. (Less Than Significant Impact with Mitigation <br />Incorporated) <br />City of Redwood City 444 Initial Study/Mitigated Negative Declaration <br />Sandpiper Elementary School Facilities Expansion November 2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.