My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2017-01-09 Closed and Joint
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2017
>
AgdaPkt 2017-01-09 Closed and Joint
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2017 7:40:57 AM
Creation date
1/5/2017 6:17:20 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
1/9/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
608
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TA. - Page 73 <br />101). The proposed project complies with all applicable, mandatory development regulations (e.g., height, building <br />disposition) in the DTPP. Therefore, implementation of the proposed project would not result in a safety hazard for <br />people residing or working in the project vicinity. <br />g. The project design would be required to comply with all applicable City codes and regulations pertaining to <br />emergency access, as well as fire protection and security. DTPP program EIR Mitigation 8-1 requires the City to <br />implement signal detectors at selected intersections as needed over time to provide priority traffic signal timing for <br />emergency response vehicles; this program is underway. As a City standard condition of approval for all <br />development projects, the project applicant must prepare a mandatory construction traffic routing and parking plan <br />subject to City review and approval, to ensure that adequate emergency access is maintained during construction; <br />all traffic control for lane closures during construction shall conform to the Work Area Traffic Control Handbook <br />administered by the City. As a result of the above requirements, the proposed project would not impair or interfere <br />with emergency access, and the impact is considered less than significant. <br />h. The project site is located in a downtown urban environment not adjacent to wildlands and therefore would not <br />expose people or structures to a significant risk of loss, injury, or death involving wildland fires. <br />Summary of Impacts <br />Potentially Less than Significant Less than <br />Significant With Mitigation Significant No <br />Impact Incorporated Impact Impact <br />IX. HYDROLOGY AND WATER QUALITY -- Would the project: <br />a) <br />Violate any water quality standards or waste discharge requirements? <br />X <br />b) <br />Substantially deplete groundwater supplies or interfere substantially with <br />X <br />groundwater recharge such that there would be a net deficit in aquifer volume <br />or a lowering of the local groundwater table level (e.g., the production rate of <br />pre-existing nearby wells would drop to a level which would not support <br />existing land uses or planned uses for which permits have been granted)? <br />c) <br />Substantially alter the existing drainage pattern of the site or area, including <br />X <br />through the alteration of the course of a stream or river, in a manner that would <br />result in substantial erosion or siltation on- or off-site? <br />d) <br />Substantially alter the existing drainage pattern of the site or area, including <br />X <br />through the alteration of the course of a stream or river, or substantially <br />increase the rate or amount of surface runoff in a manner which would result in <br />flooding on- or off-site? <br />e) <br />Create or contribute runoff water which would exceed the capacity of existing <br />X <br />or planned storm water drainage systems or provide substantial additional <br />sources of polluted runoff? <br />f) Otherwise substantially degrade water quality? X <br />g) Place housing within a 100 -year flood hazard area as mapped on a federal X <br />Flood Hazard Boundary or Flood Insurance Rate Map or other flood hazard <br />delineation map? <br />h) Place within a 100 -year flood hazard area structures that would impede or X <br />redirect flood flows? <br />i) Expose people or structures to a significant risk of loss, injury or death X <br />involving flooding, including flooding as a result of the failure of a levee or <br />dam? <br />j) Inundation by seiche, tsunami, or mudflow? X <br />Conclusion: Regarding hydrology and water quality, the proposed project would not result in any new significant <br />environmental impacts or a substantial increase in the severity of previously identified significant impacts (CEQA Guidelines <br />Section 15162(a)). All impacts are adequately evaluated in the certified Downtown Precise Plan program EIR. The proposed <br />project is also consistent with the Downtown Precise Plan (CEQA Guidelines Section 15183). <br />OR <br />
The URL can be used to link to this page
Your browser does not support the video tag.