My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2017-01-09 Closed and Joint
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2017
>
AgdaPkt 2017-01-09 Closed and Joint
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2017 7:40:57 AM
Creation date
1/5/2017 6:17:20 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
1/9/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
608
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TA. - Page 80 <br />Summary of Impacts <br />Potentially Less than Significant Less than <br />Significant With Mitigation Significant No <br />Impact Incorporated Impact Impact <br />XIV. PUBLIC SERVICES -- Would the project: <br />a) Result in substantial adverse physical impacts associated with the provision of <br />new or physically altered governmental facilities or the need for new or <br />physically altered governmental facilities, the construction of which could <br />cause significant environmental impacts, in order to maintain acceptable <br />service ratios, response times or other performance objectives for any of the <br />public services: <br />Fire protection? <br />Police protection? <br />Schools? <br />Parks? <br />Solid waste? <br />X <br />X <br />X <br />X <br />X <br />Conclusion: Regarding public services, the proposed project would not result in any new significant environmental impacts <br />or a substantial increase in the severity of previously identified significant impacts (CEQA Guidelines Section 15162(a)). All <br />impacts are adequately evaluated in the certified Downtown Precise Plan program EIR. The proposed project is also <br />consistent with the Downtown Precise Plan (CEQA Guidelines Section 15183). <br />Documentation: <br />a. Implementation of the proposed project would not result in substantial physical impacts associated with the <br />provision of new or physically altered governmental facilities, or the need for new or physically altered <br />governmental facilities, in order to maintain acceptable service ratios, response times, or other performance <br />objectives beyond those identified in the DTPP program EIR (pp. 8-1 through 8-21). The project site is served by <br />the City of Redwood City Fire and Police departments. The Fire Department facility serving the project site is <br />Station 9 at 755 Marshall Street, on the same block as the project site, about two hundred feet away to the southeast. <br />The Police Department is headquartered at 1301 Maple Street, approximately one-half mile from the project site. <br />Personnel from both departments participate in the City's Plan Review Committee (PRC) process and reviewed the <br />proposed project. Neither department identified a need for new or altered fire or police facilities as a result of the <br />proposed project. <br />The project would be required to pay mandatory school impact fees. Furthermore, the DTPP program EIR (pp. 8-2 <br />through 8-21) concluded that there would be no significant impacts on fire%mergency medical service, parks and <br />recreation, schools, or solid waste service resulting from the DTPP or projects built under it. The DTPP program <br />EIR (p. 8-3) did, however, identify a potentially significant impact regarding emergency response and evacuation in <br />the Precise Plan area due to traffic congestion on local roads. Mitigation 8-1 directs the City to implement signal <br />detectors to provide priority traffic signal timing for emergency response vehicles, which would reduce this impact <br />to a less -than -significant level. This program is underway, and to -date signal detectors have been installed at all of <br />the traffic signals along the Jefferson Avenue corridor between El Camino Real and Bradford Street, and at all <br />signals along the Marshall Street corridor between Main Street and Arguello Street. <br />The project design would be required to comply with all applicable City and State codes and regulations pertaining <br />to emergency access, as well as fire protection and security. For example, project plans (Plan Sheet A2.1, 12/2115; <br />BKF Engineers, October 26, 2015, p. 3) note the following fire protection components: <br />■ The building would be fully sprinklered. <br />■ The building would have afire pump room and afire control room. <br />Both of the above fire protection components are subject to review and approval by the City and would be <br />conditions ofproject approval. <br />An existing hydrant is located directly across Bradford Street from the project; the final location and number of <br />hydrants would be reviewed and confirmed by the Fire Marshal. Flow tests have not been performed; historical <br />data for the existing water system north of the project site (at 500 Jefferson Avenue) provided by the Community <br />Development Department indicated that the rate of output in 2011 for the hydrant model was greater than 5,500 <br />gallons per minute (gpm). Final confirmation of the fire flow adequacy shall be provided by the Fire Protection <br />33 <br />
The URL can be used to link to this page
Your browser does not support the video tag.