Laserfiche WebLink
TA. - Page 82 <br />b. The project would provide two outdoor terraces (a podium -level terrace and a rooftop terrace), which would be <br />integrated with overall project construction. The project would not have an adverse physical effect on the <br />environment related to recreational facilities. <br />c) Result in a change in air traffic patterns, including either an increase in traffic X <br />levels or a change in location that results in substantial safety risks? <br />d) Substantially increase hazards due to a design feature (e.g., sharp curves or X <br />dangerous intersections) or incompatible uses? <br />e) Result in inadequate emergency access? X <br />f) Conflict with adopted policies, plans, or programs supporting alternative X <br />transportation (e.g., bus turnouts, bicycle racks)? <br />Conclusion: Regarding transportation/traffic, the proposed project would not result in any new significant environmental <br />impacts or a substantial increase in the severity of previously identified significant impacts (CEQA Guidelines Section <br />15162(a)). All impacts are adequately evaluated in the certified Downtown Precise Plan program EIR. The proposed project <br />is also consistent with the Downtown Precise Plan (CEQA Guidelines Section 15183). <br />Documentation: <br />a. & b. The DTPP program EIR (pp. 9-48 through 9-79) identified significant and unavoidable impacts at 17 area <br />intersections, as well as impacts on freeway segments, freeway ramps, and transit service. Mitigations were <br />suggested by the EIR, but the City Council of Redwood City determined that such impacts could not be avoided even <br />with the incorporation of these measures, and that no other feasible mitigations or alternatives would avoid or <br />lessen the impacts. Furthermore, the City Council judged that the benefits offered by the DTPP outweighed the <br />potential environmental impacts and adopted a Statement of Overriding Considerations to that effect. The proposed <br />project is in compliance with all applicable DTPP standards and, as a result, would not create any additional <br />transportation or traffic impacts beyond those addressed by the DTPP program EIR and Statement of Overriding <br />Considerations. The project would be required to contribute to the City's Transportation Impact Fee, which is used <br />for various sidewalk, bicycle, and automobile improvements that are identified in Book III of the DTPP. Also, the <br />project would provide sidewalk improvements along the site's street frontage on Jefferson and Bradford; these <br />improvements would enhance pedestrian comfort and safety by adding new street paving and sidewalks, ADA - <br />compliant bulbouts with curb ramps at the corner of Jefferson and Bradford, street trees and plantings, benches, <br />lighting, and four public bike racks (Plan Sheets C6.00 and C8.00, 3/25/16, and Plan Sheet Ll. 1, 3/14/16). <br />The City determined that a supplemental, project -specific traffic study was required to: (1) calculate project trip <br />generation; (2) analyze project trip distribution and assignment; (3) evaluate project traffic impacts; (4) review the <br />proposed site plan; and (5) review pedestrian and bicycle connectivity between the project site and the Redwood <br />City Transit Center and Caltrain station. The supplemental study was completed by Hexagon Transportation <br />Consultants (603 Jefferson, Redwood City, California - Trajfc Study; Hexagon Transportation Consultants, Inc.; <br />April 6, 2016). The traff c study was reviewed by City staff. The information below is based on the study. <br />■ The following intersections were studied: <br />— Jefferson Avenue/Veterans Boulevard <br />— Main Street/Veterans Boulevard <br />— Main Street/Bradford Street <br />9161 <br />Summary of Impacts <br />Potentially <br />Less than Significant Less than <br />Significant <br />With Mitigation Significant No <br />Impact <br />Incorporated Impact Impact <br />XVI. TRANSPORTATION/TRAFFIC -- Would the project: <br />a) Cause an increase in traffic that is substantial in relation to the existing traffic <br />X <br />load and capacity of the street system (i.e., result in a substantial increase in <br />either the number of vehicle trips, the volume -to -capacity ratio on roads, or <br />congestion at intersections)? <br />b) Exceed, either individually or cumulatively, a level of service standard <br />X <br />established by the county congestion management agency for designated roads <br />or highways? <br />c) Result in a change in air traffic patterns, including either an increase in traffic X <br />levels or a change in location that results in substantial safety risks? <br />d) Substantially increase hazards due to a design feature (e.g., sharp curves or X <br />dangerous intersections) or incompatible uses? <br />e) Result in inadequate emergency access? X <br />f) Conflict with adopted policies, plans, or programs supporting alternative X <br />transportation (e.g., bus turnouts, bicycle racks)? <br />Conclusion: Regarding transportation/traffic, the proposed project would not result in any new significant environmental <br />impacts or a substantial increase in the severity of previously identified significant impacts (CEQA Guidelines Section <br />15162(a)). All impacts are adequately evaluated in the certified Downtown Precise Plan program EIR. The proposed project <br />is also consistent with the Downtown Precise Plan (CEQA Guidelines Section 15183). <br />Documentation: <br />a. & b. The DTPP program EIR (pp. 9-48 through 9-79) identified significant and unavoidable impacts at 17 area <br />intersections, as well as impacts on freeway segments, freeway ramps, and transit service. Mitigations were <br />suggested by the EIR, but the City Council of Redwood City determined that such impacts could not be avoided even <br />with the incorporation of these measures, and that no other feasible mitigations or alternatives would avoid or <br />lessen the impacts. Furthermore, the City Council judged that the benefits offered by the DTPP outweighed the <br />potential environmental impacts and adopted a Statement of Overriding Considerations to that effect. The proposed <br />project is in compliance with all applicable DTPP standards and, as a result, would not create any additional <br />transportation or traffic impacts beyond those addressed by the DTPP program EIR and Statement of Overriding <br />Considerations. The project would be required to contribute to the City's Transportation Impact Fee, which is used <br />for various sidewalk, bicycle, and automobile improvements that are identified in Book III of the DTPP. Also, the <br />project would provide sidewalk improvements along the site's street frontage on Jefferson and Bradford; these <br />improvements would enhance pedestrian comfort and safety by adding new street paving and sidewalks, ADA - <br />compliant bulbouts with curb ramps at the corner of Jefferson and Bradford, street trees and plantings, benches, <br />lighting, and four public bike racks (Plan Sheets C6.00 and C8.00, 3/25/16, and Plan Sheet Ll. 1, 3/14/16). <br />The City determined that a supplemental, project -specific traffic study was required to: (1) calculate project trip <br />generation; (2) analyze project trip distribution and assignment; (3) evaluate project traffic impacts; (4) review the <br />proposed site plan; and (5) review pedestrian and bicycle connectivity between the project site and the Redwood <br />City Transit Center and Caltrain station. The supplemental study was completed by Hexagon Transportation <br />Consultants (603 Jefferson, Redwood City, California - Trajfc Study; Hexagon Transportation Consultants, Inc.; <br />April 6, 2016). The traff c study was reviewed by City staff. The information below is based on the study. <br />■ The following intersections were studied: <br />— Jefferson Avenue/Veterans Boulevard <br />— Main Street/Veterans Boulevard <br />— Main Street/Bradford Street <br />9161 <br />