Laserfiche WebLink
01/09/2017 <br />Division for approximate locations). <br />Sec. 9.81. SECTION 1101.3.1 OF THE PLUMBING CODE ADDED: Section 1 101.3.1 <br />of the Plumbing Code is added to read as follows: <br />1101.3.1 Metallic rainwater piping shall not be used underground in those areas <br />underlain by Younger Bay Mud (see map published by Redwood City Building <br />Division for approximate locations). <br />Sec. 9.82. SECTION 1208.5.2.4 OF THE PLUMBING CODE ADDED: Section <br />1208.5.2.4 of the Plumbing Code is added to read as follows: <br />1208.5.2.4 Metallic gas piping shall not be used underground in those areas <br />underlain by Younger Bay Mud (see map published by Redwood City Building <br />Division for approximate locations). <br />SECTION 5. Article VII of Chapter 9 of the Redwood City Code is hereby added <br />to read as follows: <br />ARTICLE VII RESERVED. <br />SECTION 6. A new Article VIII of Chapter 9 of the Redwood City Code is hereby <br />added to read as follows: <br />ARTICLE VIII AMENDMENTS TO 2016 CALIFORNIA ELECTRICAL CODE <br />Sec. 9.83. SECTION 300.6 (A) (4) OF THE ELECTRICAL CODE ADDED: Section 300.6 <br />(A) (4) of the Electrical Code is added to read as follows: <br />Section 300.6(A)(4). Metallic conduit shall not be used underground in those areas <br />underlain by Younger Bay Mud (see map published by Redwood City Building & <br />Inspection for approximate locations). <br />Sec. 9.84. SECTION 240.24(A)(5) OF THE ELECTRICAL CODE ADDED: Section <br />240.24(A)(5) of the Electrical Code is added to read as follows: <br />Section 240.24(A)(5). Overcurrent devices in accessible or adaptable apartments, <br />condominiums, or townhomes, or commercial facilities accessible by employees <br />shall be a maximum of 48 inches to the center grip of the operating handle of the <br />switch or circuit breaker. <br />9.85. - 9.149. RESERVED. <br />SECTION 7. A new Division 2 of Article IX of Chapter 9 of the Redwood City <br />Code is added to read as follows: <br />ARTICLE IX. SEISMIC REQUIREMENTS <br />ATN/ORD.433/BUILDING CODE ADOPTION <br />REV: 12-19-16 RL <br />Page 14 of 16 <br />ORDINANCE NO. 2428 <br />MUFF NO. 305 <br />