My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2017-01-23 Closed and Joint
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2017
>
AgdaPkt 2017-01-23 Closed and Joint
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2017 10:22:46 AM
Creation date
1/19/2017 3:58:58 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
1/23/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
645
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Section 4.0 – Environmental Setting and Discussion of Impacts <br /> <br /> <br />City of Redwood City 106 Initial Study/Mitigated Negative Declaration <br />Sandpiper Elementary School Facilities Expansion November 2016 <br />4.18.2.5 Cumulative Cultural Resource Impacts <br /> <br />As discussed in Section 4.5, Cultural Resources, construction of the proposed project is unlikely to <br />result in impacts to buried cultural resources or human remains. Furthermore, the project includes <br />mitigation measures to reduce impacts to cultural resources to a less than significant level in the <br />unlikely event they are discovered during project construction. For these reasons, the project would <br />not contribute to cumulative cultural resources impact. (Less Than Significant Impact) <br /> <br />4.18.2.6 Cumulative Geology and Soils Impacts <br /> <br />As discussed in Section 4.6, Geology and Soils, development of the proposed project could result in <br />increased differential settlement on the project site. The project would include MM GEO-1, which <br />would reduce this impact to a less than significant level. Therefore, the project would not contribute <br />to cumulative geology and soils impact. (Less Than Significant Impact) <br /> <br />4.18.2.7 Cumulative Greenhouse Gas Emissions Impacts <br /> <br />As with air quality impacts, greenhouse gas emission impacts are, by nature, cumulative impacts. As <br />discussed in Section 4.7, Greenhouse Gas Emissions, the proposed project consists of infill <br />development that would not result in a significant greenhouse gas emissions impact. Therefore, the <br />proposed project would not result in a significant cumulative greenhouse gas emissions impact. <br />(Less Than Significant Impact) <br /> <br />4.18.2.8 Cumulative Hazards and Hazardous Materials Impacts <br /> <br />Hazardous material impacts are typically localized and, as a result, do not combine with other <br />hazardous material impacts to result in significant cumulative impacts. As discussed in Section 4.8, <br />Hazards and Hazardous Materials, the proposed project consists of infill development that would <br />not result in a significant hazards and hazardous materials impact. For these reasons, the proposed <br />project would not contribute to a cumulative hazards and hazardous materials impact. (Less Than <br />Significant Impact) <br /> <br />4.18.2.9 Cumulative Hydrology and Water Quality Impacts <br /> <br />As discussed in Section 4.9, Hydrology and Water Quality, the proposed project consists of infill <br />development that would not result in a significant hydrology and water quality impact. Furthermore, <br />the project site is located in an area that is built-out, and there are no known projects in the area that <br />would result in a significant cumulative hydrology and water quality impact. For these reasons, the <br />proposed project would not contribute to a cumulative hydrology and water quality impact. (Less <br />Than Significant Impact) <br /> <br />4.18.2.10 Cumulative Land Use Impacts <br /> <br />As discussed in Section 4.10, Land Use, the proposed project consists of infill development that <br />would not result in a significant land use impact. Furthermore, the project site is located in an area <br />7.A. - Page 137
The URL can be used to link to this page
Your browser does not support the video tag.