My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso PC16-20 0001 PC Reso 1409 El Camino
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2017
>
Reso PC16-20 0001 PC Reso 1409 El Camino
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2017 4:49:17 PM
Creation date
1/19/2017 4:46:49 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
Planning Commission
Date
1/17/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SVCW prior to issuance of the building permit. [SDR][ENGINEERING] <br />36. Backflow Protection — Backflow protection on all water services is required. <br />The backflow preventer shall be above grade and located on private property, <br />accessible to the Public Works division for testing. [COA][ENGINEERING] <br />37. Fire Flow - The Project shall meet Fre flow requirements as established by <br />the Fire Department which are based on the Fire Code. Fire flow tests are <br />typically performed during the preliminary design phase but must be <br />completed prior to submittal of final design. Applicant shall contact the Fire <br />Department for fire flow requirements, and then submit a written fire flow test <br />request to Engineering. [COA][ENGINEERING] <br />38. C3 Requirements - Plans shall be designed to meet C3 requirements of the <br />Municipal Regional Permit (MRP) NPDES Permit CAS612008 and be in <br />compliance with San Mateo County C.3 Stormwater Technical Guidance. <br />[SDR][ENGINEER] NG] <br />a. Treatment Controls — Treatment measures to be shown on final <br />improvement or grading plans shall not differ materially from the <br />treatment measures presented on the project's Tentative Parcel <br />Map, approved on, without written approval from the Engineering <br />Department. <br />b. Treatment Measure Inspection — Applicant shall coordinate <br />installation of stormwater treatment measures with the municipality, <br />shall arrange to have the City's designated inspector present at the <br />time of installation, and shall have the City's designated inspector <br />complete a final inspection of installed stormwater treatment <br />measure immediately after installation is complete. <br />39. Stormwater Management Plan (SWMP) — Applicant shall prepare a SWMP <br />that includes, at a minimum, exhibit(s) showing drainage areas and location <br />of Low Impact Development (LID) treatment measures; total project site area <br />and total area of land disturbed; total new and/or replaced impervious area; <br />treatment measures and hydraulic sizing calculations; a listing of source <br />control and site design measures to be implemented at the site; saturated <br />hydraulic conductivity rate(s) at relevant locations or hydrologic soil type (A, <br />B, C or D) and source of information; elevation of high seasonal groundwater <br />table; and a brief summary of how the project is complying with Provision C.3 <br />of the MRP.Sf DRI[ENGINEERING] <br />40. Construction General Permit — For construction activity resulting in a land <br />disturbance of one acre or more, applicant shall file a Notice of Intent (NOI) <br />with the State Water Resources Control Board under the Construction <br />Activities Storm Water General Permit (General Permit). The NO] indicates <br />the applicant's intent to comply with the San Mateo Countywide Stormwater <br />Pollution Prevention Program, including a Stormwater Pollution Prevention <br />Plan (SWPPP). [SDR] [ENGINEERING] <br />Page 13 of22 <br />ATfY/RESO.0001/PC RESO 1409 EL CAMI NO <br />REV: 01-19-17 PR <br />
The URL can be used to link to this page
Your browser does not support the video tag.