My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso PC16-20 0001 PC Reso 1409 El Camino
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2017
>
Reso PC16-20 0001 PC Reso 1409 El Camino
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2017 4:49:17 PM
Creation date
1/19/2017 4:46:49 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
Planning Commission
Date
1/17/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
41. Stormwater BMPs - Stormwater Pollution Prevention Program Best <br />Management Practices (BMPs) for construction shall be implemented to <br />protect water quality, in accordance with the approved Stormwater Pollution <br />Prevention Plan (SWPPP). BMP plan sheets are available electronically for <br />inserting into project plans.Sf DRJ[ENGINEERING] <br />Street Infrastructure Improvements <br />42. Streetlights - A new streetlight shall be installed, if needed, as determined <br />by the City Engineer. Streetlights are required on the construction of a new <br />commercial building or performance of substantial commercial remodeling <br />with street frontage of 200 feet or more. The style and location of all <br />streetlights shall be as determined by the City Landscape Architect. <br />Sf DRI[ENGINEERING] <br />43. Street Trees - A total of 32 (24 -inch box) street trees shall be planted along <br />Franklin, Diller, EI Camino Real, and the alleyway frontages. The tree species <br />and location shall be as determined by the City Landscape Architect. These <br />improvements shall be included as part of the building permit submittal <br />package. FSDRI[ENGINEERING] <br />44. Repair or Replace Street Infrastructure - Restore streets surrounding the <br />project site to the satisfaction of the City Engineer at project completion. <br />When this requires additional pavement restoration, the Engineer shall <br />approve the preferred layout of pavement markings. [SDR][ENGINEERING] <br />a. The entire width of Diller Street along the project frontage, including <br />street, curb, gutter, and sidewalks on both sides of the street (except <br />for the sidewalk, curb, and gutter work included in the project located <br />at 1305 EI Camino Real). <br />b. Permittee shall request permission from Caltrans to: (1) restore EI <br />Camino Real, from the median island to the property line, along the <br />project frontage, including the intersection with Diller Street, <br />including the street, curb, gutter, and sidewalks, and (2) remove the <br />right -turn only land on EI Camino Real. If granted, these changes <br />will be implemented with the reconstruction of the street. <br />c. The sidewalk on the southwest side of Franklin St between the bulb - <br />outs on Wilson St and Diller St. <br />d. Bulb -outs on both sides of Diller Street at the intersection with <br />Franklin Street. <br />e. All sidewalk replacement will need to include street trees and <br />pedestrian lighting at a spacing as required by the City's Landscape <br />Architect. <br />45. Pavement Moratorium - Portions of Franklin, and Diller Streets have either <br />recently been reconstructed, or may be reconstructed prior to or as part of <br />Page 14 022 <br />AIRY/RESO.0001/PC RESO 1409 EL CAMINO <br />REV: 01-19-17 PR <br />
The URL can be used to link to this page
Your browser does not support the video tag.