My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt17 Dewey Services, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2017
>
Agmt17 Dewey Services, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2021 5:02:03 PM
Creation date
2/22/2017 10:22:13 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Dewey Services, Inc.
PROJECT NAME
Vector Control Services
RMP File Number
304
Date
2/22/2017
MO Ref
17-021
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
P (black) <br />Paved over <br />T (black) <br />Tight cover <br />V (black) <br />Vehicle over <br />N (black) <br />Not located <br />IV. Task 2: Sewer Cockroach Control Program <br />The work consists of opening 143 specifically selected sanitary sewer manholes in the City <br />of Redwood City during the months of September, December, March, and June, in order to <br />inspect and apply insecticide to the vertical wall. Contractor shall service manholes in the <br />presence of SMCMVCD's Vector Control Specialist or his/her representative. <br />A. Materials and Equipment: All tools, labor, materials and equipment necessary to <br />carry out this program are to be provided by the Contractor. No alteration or <br />substitution of materials is permissible without the express written authority of <br />City or SMCMVCD. <br />B. Insecticide: Contractor will use BorActin (active ingredient: Orthoboric acid <br />99%) as the insecticide. The insecticide shall be used in the form of a spray. <br />Contractor shall use materials and equipment as specified by the manufacturer's <br />labeling. <br />The City and/or SMCMVCD reserve the right to change the insecticide at any <br />time to comply with new regulations or other factors. Notice will be given to <br />Contractor in a reasonable amount of time specifying what needs to be changed. <br />C. Method of Pesticide Application: Contractor shall service manholes in the <br />presence of SMCMVCD's Vector Control Specialist or his/her representative. <br />Contractor shall notify SMCMVCD's Vector Control Specialist to schedule the <br />event at least two (2) weeks prior to application. <br />Contractor shall apply a band of insecticide to the vertical wall of the sewer <br />manhole shaft two (2) feet wide and six (6) inches down from the lip of the <br />manhole. <br />V. Task 3 & 4: Creek Rodent Control Program <br />The work consists of installing a total of approximately 681 protective bait stations, each <br />containing an eight (8) ounce paraffin bait block, along natural drainage creeks and other <br />areas in the amounts prescribed below. A special map showing the general location of the <br />stations is available for inspection at the Office of the SMCMVCD. <br />REV: 12-19-18 PT <br />Page 8 of 13 <br />ATTY/AGR.Amend No. 1 /Dewey Services, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.